Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
NBSG11MNHTBG
Onsemi
IC CLK BUFFER 1:2 12GHZ 16QFN

Lead Time: 9-12Days

-- --
4100
Total: $
NBSG14MNR2G
Onsemi
IC CLK BUFFER 1:4 12GHZ 16QFN

Lead Time: 9-12Days

-- --
2300
Total: $
MKP385336250JKP2T0
Vishay
CAP FILM 0.036UF 5% 2.5KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
8700
Total: $
HMC720LP3ETR
Analog Devices
IC CLK BUFFER 1:2 14GHZ 16QFN

MPQ: 500

Lead Time: 9-12Days

-- --
6300
Total: $
MKP385336250JKM2T0
Vishay
CAP FILM 0.036UF 5% 2.5KVDC RAD

MPQ: 100

Lead Time: 9-12Days

-- --
7400
Total: $
HMC744LC3TR-R5
Analog Devices
IC CLK BUFFER 1:2 14GHZ 16CSMT

MPQ: 500

Lead Time: 9-12Days

-- --
7200
Total: $
HMC744LC3TR
Analog Devices
IC CLK BUFFER 1:2 14GHZ 16SMD

MPQ: 100

Lead Time: 9-12Days

-- --
7400
Total: $
HMC724LC3TR
Analog Devices
IC CLK BUFFER 1:2 14GHZ 16CSMT

MPQ: 100

Lead Time: 9-12Days

-- --
8000
Total: $
BFC247944434
Vishay
CAP FILM 0.43UF 5% 250VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
8900
Total: $
HMC850LC3TR-R5
Analog Devices
IC CLK BUFFER 1:2 20GHZ 16CSMT

MPQ: 500

Lead Time: 9-12Days

-- --
4200
Total: $
AD246JN
Analog Devices
IC CLK BUFFER 1:1 25KHZ 24DIP

Lead Time: 9-12Days

-- --
500
Total: $
BFC247942434
Vishay
CAP FILM 0.43UF 5% 250VDC RADIAL

MPQ: 1000

Lead Time: 9-12Days

-- --
2000
Total: $
HMC940LC4BTR-R5
Analog Devices
IC CLK BUFFER 1:4 13GHZ 24CSMT

Lead Time: 9-12Days

-- --
700
Total: $
QAP2E225JRP
Nichicon
CAP FILM 2.2UF 5% 250VDC AXIAL

Lead Time: 9-12Days

-- --
6400
Total: $
HMC940LC4BTR
Analog Devices
IC CLOCK BUFFER 1:4 24SMT

Lead Time: 9-12Days

-- --
7800
Total: $
MKP1840533255M
Vishay
CAP FILM 3.3UF 10% 250VDC RADIAL

MPQ: 110

Lead Time: 9-12Days

-- --
8100
Total: $
MC10EL11DR2
Onsemi
IC CLK BUFFER 1:2 1.5GHZ 8-SOIC

Lead Time: 9-12Days

-- --
3900
Total: $
MC100EL11DR2
Onsemi
IC CLK BUFFER 1:2 1.5GHZ 8-SOIC

Lead Time: 9-12Days

-- --
5800
Total: $
MKP1840533254M
Vishay
CAP FILM 3.3UF 5% 250VDC RADIAL

MPQ: 110

Lead Time: 9-12Days

-- --
4900
Total: $
BFC233916105
Vishay
CAP FILM 1UF 10% 630VDC RADIAL

MPQ: 300

Lead Time: 9-12Days

-- --
7100
Total: $
  • 1
  • 5108
  • 5109
  • 5110
  • 5111
  • 5112
  • 6854
Go to