Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MCP6L91T-E/OT
Microchip
7V/us 1pA 10MHz

Lead Time: 9-12Days

-- --
1300
Total: $
MCP73871T-2CCI/ML
Microchip
1A 6V /

Lead Time: 9-12Days

-- --
2300
Total: $
S-LESD8D8.0CT5G
Lrc
ESD ESD, 8V,

Lead Time: 9-12Days

-- --
7100
Total: $
SMD1812B050TF
Yageo
1812 500mA

Lead Time: 9-12Days

-- --
1500
Total: $
LM4040AIM3-5.0/TR
Hgsemi
!

Lead Time: 9-12Days

-- --
3500
Total: $
PN8776SS-A1
Chipown

Lead Time: 9-12Days

-- --
9300
Total: $
SGM4518XS16G/TR
Sgmicro
SGM4518XS16G/TR

Lead Time: 9-12Days

-- --
300
Total: $
S9013(RANGE:144-202)
Jscj
BJT 625mW 25V 500mA NPN

Lead Time: 9-12Days

-- --
6500
Total: $
THB6064AH
Toshiba
THB6064AH

Lead Time: 9-12Days

-- --
1100
Total: $
XC9104D093MR-G
Torex Semiconductor Ltd.
IC: PMIC; DC/DC converter; Uin: 0.9÷10VDC; Uout: 1.5÷30VDC;

Lead Time: 9-12Days

-- --
9900
Total: $
YC124-FR-0756RL
Yageo
56Ω 62.5mW ±1%

Lead Time: 9-12Days

-- --
5100
Total: $
XC6201P332MR-G
Torex Semiconductor Ltd.
LDO 10V 150mA 3.3V

Lead Time: 9-12Days

-- --
8300
Total: $
ZXTN2018FTA
Diodes Incorporated
BJT 1.2W 60V 5A NPN

Lead Time: 9-12Days

-- --
8900
Total: $
162KD14-F
Yageo
14mm 1.6KV

Lead Time: 9-12Days

-- --
5300
Total: $
ESR10EZPJ512
Rohm Semiconductor
400mW 5.1kΩ ±5%

Lead Time: 9-12Days

-- --
9900
Total: $
SMDJ60CA/TR13
Yageo
TVS SMDJ60CA/TR13

Lead Time: 9-12Days

-- --
500
Total: $
SMDJ12CA/TR13
Yageo
TVS SMDJ12CA/TR13 19.9V SMCDO-214AB

Lead Time: 9-12Days

-- --
8300
Total: $
SMCJ75A/TR13
Yageo

Lead Time: 9-12Days

-- --
7900
Total: $
SMCJ6.5CA/TR13
Yageo

Lead Time: 9-12Days

-- --
3300
Total: $
SMD1812B110TF
Yageo
1812 1.1A

Lead Time: 9-12Days

-- --
3700
Total: $
  • 1
  • 500
  • 501
  • 502
  • 503
  • 504
  • 6755
Go to