Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SY89465UMG TR
Microchip
IC CLK MULTIPLX 2:10 2GHZ 44MLF

MPQ: 1000

Lead Time: 9-12Days

-- --
6300
Total: $
PI6C59S6005ZDIEX
Diodes Incorporated
IC CLK BUFFER 4:10 6GHZ 24TQFN

MPQ: 3500

Lead Time: 9-12Days

-- --
3800
Total: $
TSW-101-07-H-D
Samtec
CONN HEADER VERT 2POS

MPQ: 1

Lead Time: 9-12Days

-- --
1900
Total: $
MC100LVEP111FARG
Onsemi
IC CLK BUFFER 2:10 3GHZ 32LQFP

Lead Time: 9-12Days

-- --
9500
Total: $
TMM-102-05-TM-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
6100
Total: $
TMM-102-04-TM-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
5900
Total: $
MC100EP11DR2G
Onsemi
IC CLK BUFFER 1:2 3GHZ 8SOIC

Lead Time: 9-12Days

-- --
2000
Total: $
TMM-104-05-T-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
8300
Total: $
TMM-104-04-TM-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
9400
Total: $
PI6CB332000ZDIEX
Diodes Incorporated
IC CLK BUFFER 1:20 200MHZ 72TQFN

MPQ: 2500

Lead Time: 9-12Days

-- --
8800
Total: $
TMM-104-04-T-S
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
PI6C49S1510AZDIEX
Diodes Incorporated
IC CLK BUFFER 3:21 1.5GHZ 48TQFN

MPQ: 3000

Lead Time: 9-12Days

-- --
4000
Total: $
TMM-102-05-T-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
3200
Total: $
TMM-102-05-F-D
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
SY89875UMG-TR
Microchip
IC CLK BUFFER 1:2 2GHZ 16MLF

MPQ: 1000

Lead Time: 9-12Days

-- --
500
Total: $
TMM-102-04-T-D-SM
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
1900
Total: $
CDCDB2000NPPR
Texas Instruments
IC CLK BUFFER 1:20 250MHZ 80TLGA

MPQ: 3000

Lead Time: 9-12Days

-- --
9100
Total: $
TMM-102-04-F-D
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
7200
Total: $
TMM-102-03-F-D
Samtec
2MM TERMINAL STRIP

MPQ: 1

Lead Time: 9-12Days

-- --
3300
Total: $
MC100LVEP11DR2G
Onsemi
IC CLK BUFFER 1:2 3GHZ 8SOIC

Lead Time: 9-12Days

-- --
6900
Total: $
  • 1
  • 5013
  • 5014
  • 5015
  • 5016
  • 5017
  • 6854
Go to