
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
5223986-8
| Te Connectivity |
CONN KEYED GUIDE MODULE R/A 4-40
| Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
RNF-3000-6/2-9-SP
| Te Connectivity |
HEAT SHRINK TUBING 1=1M
| Lead Time: 9-12Days | -- -- | 3400 | Total:
$
| |
RNF-3000-1.5/0.5-2-SP
| Te Connectivity |
HEAT SHRINK 1=1M
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
5120913-3
| Te Connectivity |
CONN GUIDE MODULE KEYED 3POS
| MPQ: 1000 Lead Time: 9-12Days | -- -- | 400 | Total:
$
| |
V4-6.0-0-SP-SM
| Te Connectivity |
HEAT SHRINK TUBING 1=1M
| Lead Time: 9-12Days | -- -- | 3100 | Total:
$
| |
V4-8.0-0-FSP-SM
| Te Connectivity |
HEAT SHRINK TUBING BLK
| Lead Time: 9-12Days | -- -- | 100 | Total:
$
| |
5120913-2
| Te Connectivity |
CONN 2POS KEYED GUIDE MODULE
| Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
1766290-1
| Te Connectivity |
BUSHING,REDUCER
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
1-1469267-1
| Te Connectivity |
GUIDE MODULE VERT SHORT PIN ATCA
| Lead Time: 9-12Days | -- -- | 500 | Total:
$
| |
V4-5.0-0-SP-SM
| Te Connectivity |
HEAT SHRINK TUBING 1=1M
| Lead Time: 9-12Days | -- -- | 2000 | Total:
$
| |
1-1469388-1
| Te Connectivity |
GUIDE MODULE VERT LONG PIN ATCA
| Lead Time: 9-12Days | -- -- | 5300 | Total:
$
| |
1-1469268-1
| Te Connectivity |
GUIDE MODULE R/A FEMALE
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
201414-1
| Te Connectivity |
CONN JACKSCREW LONG FEMALE
| MPQ: 100 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
V4-3.5-0-SP-SM
| Te Connectivity |
HEAT SHRINK TUBING 1=1M
| Lead Time: 9-12Days | -- -- | 7000 | Total:
$
| |
532807-1
| Te Connectivity |
HDI GUIDE PIN
| MPQ: 225 Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
3-1469387-7
| Te Connectivity |
ATCA GUIDE MODULE VERT SHORT
| Lead Time: 9-12Days | -- -- | 5400 | Total:
$
| |
200868-1
| Te Connectivity |
CONN JACKSCREW SHORT MALE
| Lead Time: 9-12Days | -- -- | 9000 | Total:
$
| |
211600-1
| Te Connectivity |
CONN COVER DUST FOR SIZE 1
| Lead Time: 9-12Days | -- -- | 5700 | Total:
$
| |
ES2000-NO.4-B7-0-60MM
| Te Connectivity |
HEATSHRINK 0.7" X 0.196' BLACK
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
ES2000-NO.4-B7-0-50MM
| Te Connectivity |
HEATSHRINK 0.7" X 0.164' BLACK
| Lead Time: 9-12Days | -- -- | 1400 | Total:
$
|