Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
0603Y0160683MDT
Knowles
CAP CER 0.068UF 16V X7R 0603

MPQ: 4000

Lead Time: 9-12Days

-- --
6700
Total: $
C0805F224K4RACAUTO
Kemet(Yageo)
CAP CER 0.22UF 16V X7R 0805

MPQ: 2500

Lead Time: 9-12Days

-- --
3300
Total: $
CY22800FXC-033A
Infineon
IC PROG CLOCK GEN 8-SOIC

Lead Time: 9-12Days

-- --
4900
Total: $
GRM32AR61C106MAB7K
Murata
CAP CER MLCC

MPQ: 10000

Lead Time: 9-12Days

-- --
6000
Total: $
C1206F105M5RACAUTO7210
Kemet(Yageo)
CAP CER 1UF 50V X7R 1206

MPQ: 8000

Lead Time: 9-12Days

-- --
1100
Total: $
CY22800FXC-035A
Infineon
IC PROG CLOCK GEN 8-SOIC

Lead Time: 9-12Days

-- --
3900
Total: $
CY22800FXC-036A
Infineon
IC PROG CLOCK GEN 8-SOIC

Lead Time: 9-12Days

-- --
6100
Total: $
W83176G-732
Nuvoton
IC CLK BUF DDR 200MHZ 1CIRC

Lead Time: 9-12Days

-- --
6300
Total: $
W83194BG-703
Nuvoton
IC CLOCK GENERATOR 48-SSOP

Lead Time: 9-12Days

-- --
3800
Total: $
DE2E3KY472MJ3BM02F
Murata
CAP CER

Lead Time: 9-12Days

-- --
3000
Total: $
W83195BG-118
Nuvoton
IC CLOCK GENERATOR 48-SSOP

Lead Time: 9-12Days

-- --
5000
Total: $
C1206C473G3JAC7800
Kemet(Yageo)
CAP CER 0.047UF 25V U2J 1206

MPQ: 4000

Lead Time: 9-12Days

-- --
2400
Total: $
CS1206KKX7RZBB153
Yageo
CAP CER 0.015UF 630V X7R 1206

MPQ: 3000

Lead Time: 9-12Days

-- --
8000
Total: $
GA1210A392GBBAT31G
Vishay
CAP CER 3900PF 100V C0G/NP0 1210

Lead Time: 9-12Days

-- --
7200
Total: $
GA1210A392GBBAR31G
Vishay
CAP CER 3900PF 100V C0G/NP0 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
800
Total: $
GA1210A392GBAAT31G
Vishay
CAP CER 3900PF 50V C0G/NP0 1210

Lead Time: 9-12Days

-- --
400
Total: $
GA1210A392GBAAR31G
Vishay
CAP CER 3900PF 50V C0G/NP0 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
6400
Total: $
GA1210A332GBBAT31G
Vishay
CAP CER 3300PF 100V C0G/NP0 1210

Lead Time: 9-12Days

-- --
7800
Total: $
GA1210A332GBBAR31G
Vishay
CAP CER 3300PF 100V C0G/NP0 1210

MPQ: 10000

Lead Time: 9-12Days

-- --
8200
Total: $
GA1210A332GBAAT31G
Vishay
CAP CER 3300PF 50V C0G/NP0 1210

Lead Time: 9-12Days

-- --
6200
Total: $
  • 1
  • 4880
  • 4881
  • 4882
  • 4883
  • 4884
  • 6854
Go to