Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAN6941C
Onsemi
DISPLAY 7SEG 0.56" DBL RED 18DIP

Lead Time: 9-12Days

-- --
8100
Total: $
MAN6950
Onsemi
DISP 7SEG 0.56" 1.5DIG RED 18DIP

Lead Time: 9-12Days

-- --
8000
Total: $
MAN6960E
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
7300
Total: $
MAN6961C
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
600
Total: $
MAN6980E
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
8200
Total: $
MAN6981C
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
7500
Total: $
MAN73A
Onsemi
DISP 7SEG 0.29" OV/FL RED 14DIP

Lead Time: 9-12Days

-- --
7500
Total: $
MAN8010
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 12DIP

Lead Time: 9-12Days

-- --
3700
Total: $
MAN8040
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 12DIP

Lead Time: 9-12Days

-- --
1000
Total: $
MTSW-105-09-T-S-430
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
600
Total: $
MAN8210
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 18DIP

Lead Time: 9-12Days

-- --
1700
Total: $
MAN8240
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 18DIP

Lead Time: 9-12Days

-- --
3000
Total: $
MAN8410
Onsemi
DISPLAY 7SEG 0.8" SGL GRN 18DIP

Lead Time: 9-12Days

-- --
8700
Total: $
MAN8440
Onsemi
DISPLAY 7SEG 0.8" SGL GRN 18DIP

Lead Time: 9-12Days

-- --
6000
Total: $
MAN8910
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 18DIP

Lead Time: 9-12Days

-- --
5200
Total: $
MAN8940
Onsemi
DISPLAY 7-SEG 0.8" SGL RED 18DIP

Lead Time: 9-12Days

-- --
7000
Total: $
MAN8H10C
Onsemi
DISPLAY 7SEG 0.54" DBL RED 18DIP

Lead Time: 9-12Days

-- --
3800
Total: $
MANC3110
Onsemi
DISPLAY 7-SEG 0.3" SGL RED 10DIP

Lead Time: 9-12Days

-- --
5800
Total: $
MANC3140
Onsemi
DISPLAY 7-SEG 0.3" SGL RED 10DIP

Lead Time: 9-12Days

-- --
4300
Total: $
MANC3410
Onsemi
DISPLAY 7SEG 0.3" SGL GRN 10DIP

Lead Time: 9-12Days

-- --
5000
Total: $
  • 1
  • 4653
  • 4654
  • 4655
  • 4656
  • 4657
  • 6854
Go to