Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAN5460
Onsemi
DISPLAY 7SEG 0.51" SGL GRN 10DIP

Lead Time: 9-12Days

-- --
9300
Total: $
MAN5750
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
5900
Total: $
MAN5760
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
6000
Total: $
MAN5950
Onsemi
DISP 7SEG 0.51" SGL OR-RED 10DIP

Lead Time: 9-12Days

-- --
1900
Total: $
MTSW-106-22-T-S-295
Samtec
CONN HEADER VERT 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2300
Total: $
MTSW-106-22-T-S-276
Samtec
CONN HEADER VERT 6POS 2.54MM

Lead Time: 9-12Days

-- --
3000
Total: $
MAN5960
Onsemi
DISP 7SEG 0.51" SGL OR-RED 10DIP

Lead Time: 9-12Days

-- --
4300
Total: $
MAN5H50
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
9200
Total: $
MAN5H60
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
6700
Total: $
MAN5R50
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
600
Total: $
MAN5R60
Onsemi
DISPLAY 7SEG 0.51" SGL RED 10DIP

Lead Time: 9-12Days

-- --
8900
Total: $
MAN5Y50
Onsemi
DISPLAY 7SEG 0.51" SGL YLW 10DIP

Lead Time: 9-12Days

-- --
5500
Total: $
MAN5Y60
Onsemi
DISPLAY 7SEG 0.51" SGL YLW 10DIP

Lead Time: 9-12Days

-- --
2800
Total: $
MAN6060
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
3800
Total: $
MAN6080
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
7900
Total: $
MAN6110E
Onsemi
DISPLAY 7SEG 0.56" DBL RED 18DIP

Lead Time: 9-12Days

-- --
2200
Total: $
MAN6111C
Onsemi
DISPLAY 7SEG 0.56" DBL RED 18DIP

Lead Time: 9-12Days

-- --
7300
Total: $
MAN6140E
Onsemi
DISPLAY 7SEG 0.56" DBL RED 18DIP

Lead Time: 9-12Days

-- --
1200
Total: $
MAN6141C
Onsemi
DISPLAY 7SEG 0.56" DBL RED 18DIP

Lead Time: 9-12Days

-- --
4200
Total: $
MAN6161C
Onsemi
DISPLAY 7SEG 0.56" SGL RED 10DIP

Lead Time: 9-12Days

-- --
4300
Total: $
  • 1
  • 4651
  • 4652
  • 4653
  • 4654
  • 4655
  • 6854
Go to