Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PDS-408G/AC
Microchip
8-PORT POE SWITCH BT 480W AC

MPQ: 5

Lead Time: 9-12Days

-- --
4500
Total: $
BCM953125RM
Broadcom(Avago)
NETWORK 4 PORT

Lead Time: 9-12Days

-- --
3200
Total: $
BCM953101R
Broadcom(Avago)
NETWORK 5 PORT

Lead Time: 9-12Days

-- --
700
Total: $
HLMP-0103
Broadcom(Avago)
CLIP/RING MOUNT FOR 5MM LEDS

MPQ: 2000

Lead Time: 9-12Days

-- --
3900
Total: $
AFBR-390525RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

MPQ: 200

Lead Time: 9-12Days

-- --
7200
Total: $
HLMP-5029
Broadcom(Avago)
HOUSING RA FOR 5MM HIGH DOME LED

MPQ: 2000

Lead Time: 9-12Days

-- --
1200
Total: $
AFBR-395025RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

MPQ: 200

Lead Time: 9-12Days

-- --
8000
Total: $
HFBR-4411Z
Broadcom(Avago)
HDWR V-LINK NUTSWASHERS 100EA ST

Lead Time: 9-12Days

-- --
5700
Total: $
HFBR-4521Z
Broadcom(Avago)
HDWR V-LINK HCS CONN/CRIMP SIMPL

Lead Time: 9-12Days

-- --
7400
Total: $
AFBR-390550RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

Lead Time: 9-12Days

-- --
1700
Total: $
AFBR-390575RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

MPQ: 120

Lead Time: 9-12Days

-- --
1400
Total: $
AFBR-395075RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

MPQ: 120

Lead Time: 9-12Days

-- --
300
Total: $
AFBR-395000RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 50MBAUD

Lead Time: 9-12Days

-- --
9200
Total: $
HLMP-1050
Broadcom(Avago)
LED HOUSING 3MM RT ANGLE MOUNT

MPQ: 2000

Lead Time: 9-12Days

-- --
2200
Total: $
HFBR-4522Z
Broadcom(Avago)
HDWR V-LINK PORT PLUGS 1=500PC

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
AFBR-390500RZ
Broadcom(Avago)
FIBER OPTIC RECEIVER 5MBAUD

Lead Time: 9-12Days

-- --
8500
Total: $
HFBR-4120Z
Broadcom(Avago)
HDWR V-LINK PLUG HFBR-0400 ST

Lead Time: 9-12Days

-- --
8800
Total: $
CIM05U601NC
Samsung
FERRITE BEAD 600 OHM 0402 1LN

Lead Time: 9-12Days

-- --
8600
Total: $
CIB10P330NC
Samsung
FERRITE BEAD 33 OHM 0603 1LN

Lead Time: 9-12Days

-- --
7600
Total: $
CIM10U800NC
Samsung
FERRITE BEAD 80 OHM 0603 1LN

Lead Time: 9-12Days

-- --
7500
Total: $
  • 1
  • 4598
  • 4599
  • 4600
  • 4601
  • 4602
  • 6854
Go to