Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IRG4IBC30SPBF
Infineon
IGBT 600V 23.5A TO220AB FP

Lead Time: 9-12Days

-- --
6500
Total: $
IRG4BC30KDPBF
Infineon
IGBT 600V 28A TO-220AB

Lead Time: 9-12Days

-- --
8000
Total: $
IRG4IBC30FDPBF
Infineon
IGBT 600V 20.3A TO220AB FP

Lead Time: 9-12Days

-- --
300
Total: $
B32756G3156J000
Tdk
CAP FILM 15UF 5% 580VDC RADIAL

MPQ: 400

Lead Time: 9-12Days

-- --
9300
Total: $
IRG4BC30UDPBF
Infineon
IGBT 600V 23A TO-220AB

Lead Time: 9-12Days

-- --
6800
Total: $
IRG4BC10SDPBF
Infineon
IGBT 600V 14A TO-220AB

Lead Time: 9-12Days

-- --
6300
Total: $
IRG4BC30F-SPBF
Infineon
IGBT 600V 31A 100W D2PAK

Lead Time: 9-12Days

-- --
800
Total: $
MKP1847H55031KP2
Vishay
CAP FILM 5UF 10% 630VDC RADIAL

MPQ: 91

Lead Time: 9-12Days

-- --
2700
Total: $
IRG4BC20FD-SPBF
Infineon
IGBT 600V 16A 60W D2PAK

Lead Time: 9-12Days

-- --
600
Total: $
FGB30N6S2D
Onsemi
IGBT 600V 45A TO-263

Lead Time: 9-12Days

-- --
4100
Total: $
F17725222004
Vishay
CAP FILM 2.2UF 10% 630VDC RADIAL

MPQ: 60

Lead Time: 9-12Days

-- --
5000
Total: $
FGH30N6S2D
Onsemi
IGBT 600V 45A TO-247-3

Lead Time: 9-12Days

-- --
9200
Total: $
FGH40N6S2D
Onsemi
IGBT 600V 75A TO-247-3

Lead Time: 9-12Days

-- --
5300
Total: $
FGH60N6S2
Onsemi
IGBT 600V 75A TO-247-3

Lead Time: 9-12Days

-- --
9500
Total: $
942C8W1K-F
Cornell Dubilier
CAP FILM 1UF 10% 850VDC AXIAL

Lead Time: 9-12Days

-- --
9600
Total: $
FGP30N6S2D
Onsemi
IGBT 600V 45A TO-220-3

Lead Time: 9-12Days

-- --
2900
Total: $
FGP30N6S2
Onsemi
IGBT 600V 45A TO-220-3

Lead Time: 9-12Days

-- --
8100
Total: $
FGP40N6S2
Onsemi
IGBT 600V 75A TO-220-3

Lead Time: 9-12Days

-- --
1100
Total: $
HGTG7N60A4
Onsemi
IGBT 600V 34A TO-247-3

Lead Time: 9-12Days

-- --
5100
Total: $
HGTP7N60A4D
Onsemi
IGBT 600V 34A TO-220-3

Lead Time: 9-12Days

-- --
4200
Total: $
  • 1
  • 4398
  • 4399
  • 4400
  • 4401
  • 4402
  • 6854
Go to