Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IRG4PSH71U
Infineon
IGBT 1200V 99A SUPER-247

Lead Time: 9-12Days

-- --
3300
Total: $
BFC238331224
Vishay
CAP FILM 0.22UF 5% 1KVDC RADIAL

MPQ: 100

Lead Time: 9-12Days

-- --
4900
Total: $
B32656S7224K500
Tdk
CAP FILM 0.22UF 1.25KVDC SCREW

Lead Time: 9-12Days

-- --
1200
Total: $
IRG4RC10SD
Infineon
IGBT 600V 14A 38W DPAK

Lead Time: 9-12Days

-- --
2700
Total: $
IRG4RC10STRL
Infineon
IGBT 600V 14A TO-252AA

Lead Time: 9-12Days

-- --
6400
Total: $
IRG4RC10STR
Infineon
IGBT 600V 14A TO-252AA

Lead Time: 9-12Days

-- --
6000
Total: $
IRG4RC10UD
Infineon
IGBT 600V 8.5A TO-252AA

Lead Time: 9-12Days

-- --
1900
Total: $
C274AC35180SA0J
Kemet(Yageo)
CAP FILM 18UF 5% 470VAC RADIAL

MPQ: 50

Lead Time: 9-12Days

-- --
7800
Total: $
C276CCF5200LG0J
Kemet(Yageo)
CAP FILM 20UF 5% 470VAC RADIAL

MPQ: 60

Lead Time: 9-12Days

-- --
7700
Total: $
IRG4BAC50W-S
Infineon
IGBT 600V 55A SUPER-220

Lead Time: 9-12Days

-- --
2600
Total: $
IRG4RC20F
Infineon
IGBT 600V 22A TO-252AA

Lead Time: 9-12Days

-- --
3800
Total: $
IRG4BC15UD
Infineon
IGBT 600V 14A TO-220AB

Lead Time: 9-12Days

-- --
100
Total: $
IRG4BC15UD-S
Infineon
IGBT 600V 14A 49W D2PAK

Lead Time: 9-12Days

-- --
1000
Total: $
HMTSW-102-08-L-D-305
Samtec
CONN HEADER VERT 4POS 2.54MM

Lead Time: 9-12Days

-- --
1900
Total: $
IRG4BC15UD-L
Infineon
IGBT 600V 14A TO-262

Lead Time: 9-12Days

-- --
8800
Total: $
684PPA152K
Cornell Dubilier
CAP FILM 0.68UF 1.5KVDC AXIAL

Lead Time: 9-12Days

-- --
4900
Total: $
92-0235
Infineon
IGBT 430V 20A TO-220AB

Lead Time: 9-12Days

-- --
800
Total: $
IRGS14C40L
Infineon
IGBT 430V 20A 125W D2PAK

Lead Time: 9-12Days

-- --
4800
Total: $
B32758G2226K000
Tdk
CAP FILM 22UF 10% 500VDC RADIAL

MPQ: 280

Lead Time: 9-12Days

-- --
300
Total: $
IRG4BC30S-S
Infineon
IGBT 600V 34A 100W D2PAK

Lead Time: 9-12Days

-- --
1700
Total: $
  • 1
  • 4392
  • 4393
  • 4394
  • 4395
  • 4396
  • 6854
Go to