Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FAUL0420-2R2MT
Cjiang
5A 2.2uH ±20% 4.5A SMD,4.2x4.4mm

Lead Time: 9-12Days

-- --
1900
Total: $
ESD5302F-3/TR
Dowo

Lead Time: 9-12Days

-- --
8100
Total: $
PUSB3FR4Z
Dowo

Lead Time: 9-12Days

-- --
8900
Total: $
SMBJ30A
Dowo
ESD/TVS VRWM=30V VBRmin=33.3V VC=48.4V@IPP=12.4A SMB

Lead Time: 9-12Days

-- --
6300
Total: $
SMBJ6.5CA
Dowo
TVS VRWM=6.5V VBRMin=7.22V VC=11.2V IPP=53.57A Ppp=600W SMB

Lead Time: 9-12Days

-- --
7900
Total: $
SMBJ5.0A
Dowo
ESD/TVS VRWM=5V VBRmin=6.4V VC=9.2V@IPP=65.22A SMB

Lead Time: 9-12Days

-- --
8300
Total: $
SMBJ75CA
Dowo
TVS SMB Ppp=600W VC=121V Ipp=4.96A VRWM=75V

Lead Time: 9-12Days

-- --
8500
Total: $
SMBJ5.0CA
Dowo

Lead Time: 9-12Days

-- --
9500
Total: $
TPS92612DBVR
Texas Instruments
LED--IC-1---PWM--150mA-SOT-23-5

Lead Time: 9-12Days

-- --
2700
Total: $
MAX17613AATP+T
Analog Devices
、 4.5V to 60V, 3A Current-Limiter with OV,

Lead Time: 9-12Days

-- --
4100
Total: $
M1
Bourns Inc.
1.1V@1A 50V 1A SMADO-214AC

Lead Time: 9-12Days

-- --
6100
Total: $
SMFJ16CA
Bourns Inc.

Lead Time: 9-12Days

-- --
300
Total: $
DB307S
Dowo

Lead Time: 9-12Days

-- --
1700
Total: $
GBLC05C
Dowo
ESD VRWM=5V VBRMin=6V VC=30V IPP=20A Ppp=800W SOD323

Lead Time: 9-12Days

-- --
100
Total: $
FXCM4520F-701T
Cjiang
700Ω@100MHz 50V 2.2A SMD-4P,4.7x4.5mm

Lead Time: 9-12Days

-- --
4300
Total: $
LMBR1200ET1G
Dowo
200V 1A SOD-323HE

Lead Time: 9-12Days

-- --
1500
Total: $
NCV20072DMR2G
Onsemi
Op Amp Dual GP R-R O/P 36V Automotive AEC-Q100 8-Pin Micro T/R

Lead Time: 9-12Days

-- --
3900
Total: $
MVR1206-470G
Dowo

Lead Time: 9-12Days

-- --
5500
Total: $
BNPTVS15VS1UR
Bourns Inc.

Lead Time: 9-12Days

-- --
8900
Total: $
BFP760H6327
Infineon
BJT 240mW 4V 70mA NPN SOT-343

Lead Time: 9-12Days

-- --
4700
Total: $
  • 1
  • 426
  • 427
  • 428
  • 429
  • 430
  • 6755
Go to