Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
FRC0805J305 TS
Fojan
125mW 3MΩ ±5% 0805

Lead Time: 9-12Days

-- --
8900
Total: $
SMCJ24A
Jingdao
TVS SMCJ24A GEZ SMCDO-214AB

Lead Time: 9-12Days

-- --
2700
Total: $
FCC0603N6R0C500CT
Fojan
MLCC 50V 6pF C0G 0603

Lead Time: 9-12Days

-- --
3700
Total: $
FCC0805B681K500DT
Fojan
MLCC 50V ±10% 680pF X7R 0805

Lead Time: 9-12Days

-- --
3500
Total: $
FCC0603N2R2C500CT
Fojan
MLCC 50V 2.2pF C0G 0603

Lead Time: 9-12Days

-- --
1100
Total: $
AO3416
Puolop
MOSFET 1.4W 20V 6A 1N SOT-23-3L

Lead Time: 9-12Days

-- --
2500
Total: $
CL05B471KB5NNNC
Samsung
MLCC 50V ±10% 470pF X7R 0402

Lead Time: 9-12Days

-- --
4700
Total: $
FRC0805F2003TS
Fojan
125mW 200kΩ ±1% 0805

Lead Time: 9-12Days

-- --
100
Total: $
FRC0805F15R0TS
Fojan
125mW 15Ω ±1% 0805

Lead Time: 9-12Days

-- --
300
Total: $
FRC1206F60R4TS
Fojan
250mW 60.4Ω ±1% 1206

Lead Time: 9-12Days

-- --
700
Total: $
FRC2512J204 TS
Fojan
1W 200kΩ ±5% 2512

Lead Time: 9-12Days

-- --
1500
Total: $
FRC1206F1504TS
Fojan
250mW 1.5MΩ ±1% 1206

Lead Time: 9-12Days

-- --
1700
Total: $
FRC0805F1R00TS
Fojan
125mW 1Ω ±1% 0805

Lead Time: 9-12Days

-- --
2300
Total: $
FRC1206J220 TS
Fojan
250mW 22Ω ±5% 1206

Lead Time: 9-12Days

-- --
6300
Total: $
FRC0603J681 TS
Fojan
100mW 680Ω ±5% 0603

Lead Time: 9-12Days

-- --
7300
Total: $
FRC1206J150 TS
Fojan
250mW 15Ω ±5% 1206

Lead Time: 9-12Days

-- --
7500
Total: $
FRC0603F1373TS
Fojan
100mW 137kΩ ±1% 0603

Lead Time: 9-12Days

-- --
9900
Total: $
FRC0603F2262TS
Fojan
100mW 22.6kΩ ±1% 0603

Lead Time: 9-12Days

-- --
2300
Total: $
FRC0402F5603TS
Fojan
62.5mW 560kΩ ±1% 0402

Lead Time: 9-12Days

-- --
5300
Total: $
FRC0402J223 TS
Fojan
62.5mW 22kΩ ±5% 0402

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 33
  • 34
  • 35
  • 36
  • 37
  • 6854
Go to