Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MTMS-102-02-G-D-030
Samtec
CONN HDR .050" 4POS

MPQ: 1

Lead Time: 9-12Days

-- --
400
Total: $
SI88441BC-IS
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 38

Lead Time: 9-12Days

-- --
7900
Total: $
SI88443BC-IS
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 38

Lead Time: 9-12Days

-- --
900
Total: $
504HC6800K2EM8
Cornell Dubilier
CAP FILM 0.5UF 800VAC CHAS MT

MPQ: 2

Lead Time: 9-12Days

-- --
7000
Total: $
SI88640BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
4900
Total: $
HMTSW-103-07-L-S-200-LL
Samtec
CONN HEADER VERT 3POS 2.54MM

Lead Time: 9-12Days

-- --
4900
Total: $
V5583C
Assmann Wsw Components
HEATSINK ALUM ANOD

MPQ: 50

Lead Time: 9-12Days

-- --
8400
Total: $
334HC6102K2EM8
Cornell Dubilier
CAP FILM 0.33UF 1KVAC CHAS MT

MPQ: 2

Lead Time: 9-12Days

-- --
2200
Total: $
EA-T220-64E
Ohmite
HEATSINK FOR TO-220 BLACK

MPQ: 10

Lead Time: 9-12Days

-- --
4500
Total: $
HMTSW-107-23-T-S-000
Samtec
CONN HEADER VERT 7POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
8600
Total: $
265HC6600K2EM8
Cornell Dubilier
CAP FILM 2.6UF 600VAC CHAS MT

MPQ: 2

Lead Time: 9-12Days

-- --
1500
Total: $
SI88443BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
5700
Total: $
HMTSW-103-22-TM-D-240-RA
Samtec
CONN HEADER R/A 6POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
1200
Total: $
SI88444BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
8600
Total: $
SI88442BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
2000
Total: $
WV-T264-101E
Ohmite
HEATSINK W/CLIP FOR TO-264

MPQ: 30

Lead Time: 9-12Days

-- --
8700
Total: $
SI88343BC-IS
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 32

Lead Time: 9-12Days

-- --
1600
Total: $
SI88342BC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 24-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
8700
Total: $
219-263A
Wakefield-Vette
TO-263 HEAT SINK ANODZD

MPQ: 200

Lead Time: 9-12Days

-- --
1300
Total: $
664HC6800K4TM6
Cornell Dubilier
CAP FILM 0.66UF 800VAC CHAS MT

MPQ: 2

Lead Time: 9-12Days

-- --
5000
Total: $
  • 1
  • 3391
  • 3392
  • 3393
  • 3394
  • 3395
  • 6854
Go to