Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SI8712BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
8000
Total: $
ATS-61270K-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 27X27X14.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8712CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
900
Total: $
MKP385E34785KFI2B0
Vishay
CAP FILM 0.047UF 10% 850VDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8711AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
4300
Total: $
TSW-105-10-F-S-RA
Samtec
CONN HEADER R/A 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
800
Total: $
ATS-61400D-C1-R0
Advanced Thermal Solutions Inc
MAXIGRIP FANSINK 40X40X9.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711BD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
7600
Total: $
F340Y231530JF02W0
Vishay
CAP FILM 0.015UF 5% 1KVDC RAD

MPQ: 1100

Lead Time: 9-12Days

-- --
6400
Total: $
SI8711CD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
2700
Total: $
SI8712AD-B-IM
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 96

Lead Time: 9-12Days

-- --
9200
Total: $
ATS-56004-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 40MM X 30MM X 5MM

MPQ: 100

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9900
Total: $
SI8711BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
200
Total: $
MKP385E34763JF02W0
Vishay
CAP FILM 0.047UF 5% 630VDC RAD

MPQ: 800

Lead Time: 9-12Days

-- --
9200
Total: $
SI8711CD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
9600
Total: $
SI8712AD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
4100
Total: $
ATS-51290R-C1-R0
Advanced Thermal Solutions Inc
HEAT SINK 29MM X 29MM X 19.5MM

MPQ: 100

Lead Time: 9-12Days

-- --
5600
Total: $
MKP385E3101AKI02W0
Vishay
CAP FILM 10000PF 10% 1.6KVDC RAD

MPQ: 500

Lead Time: 9-12Days

-- --
2400
Total: $
SI8712BD-B-IMR
Skyworks
DGTL ISOLTR 5KV 1CH GP 8-VELGA

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
  • 1
  • 3376
  • 3377
  • 3378
  • 3379
  • 3380
  • 6854
Go to