
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
HG-501A-THERMOGUN-120V
| Te Connectivity |
HG-501A-THERMOGUN-120V
| Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
CJ2086-000
| Te Connectivity |
HL1910E HEAT GUN
| Lead Time: 9-12Days | -- -- | 2600 | Total:
$
| |
CJ2087-000
| Te Connectivity |
HL2010E HEAT GUN
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
HT-900B-P-Q37-PRESS-SWTCH
| Te Connectivity |
HT-900B-P-Q37-PRESS-SWTCH
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
TG-23/A-205-HG
| Te Connectivity |
ATTACHMENT REFLECTOR SM BOOT
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
ED-7-CONT-FRONT-PANEL
| Te Connectivity |
ED-7-CONT-FRONT-PANEL
| Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
AD-1358-LPG-REG-W/GAGE
| Te Connectivity |
PROPANE TANK REGULATOR
| Lead Time: 9-12Days | -- -- | 600 | Total:
$
| |
AD-1432-ACD10FT-LPG-HOSE
| Te Connectivity |
LPG HOSE 10FT
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
AD-1434-ACD30FT-LPG-HOSE
| Te Connectivity |
LPG HOSE 30FT
| Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
AD-1460-ACD-HEAT-SHLDGPAD
| Te Connectivity |
HEAT SHIELDING PAD
| Lead Time: 9-12Days | -- -- | 1600 | Total:
$
| |
IR-1900-STD-HTR
| Te Connectivity |
HEATING ELEMENT 220V
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4600 | Total:
$
| |
IR-1900-DRIVE-PULLEY
| Te Connectivity |
PULLEY ALUMINUM
| Lead Time: 9-12Days | -- -- | 800 | Total:
$
| |
RBK-TEMP-CALIBRATION-KIT
| Te Connectivity |
RBK-TEMP-CALIBRATION-KIT
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
IR-1900-FLOOR-STAND
| Te Connectivity |
FLOOR STAND MODEL 19 HEATERS
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
CLTEQ-M19-BELTHTR-SS
| Te Connectivity |
MODEL 19 BELT HEATER
| Lead Time: 9-12Days | -- -- | 5200 | Total:
$
| |
A22932-000
| Te Connectivity |
HL2010E-230V-UK
| Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
F11734-000
| Te Connectivity |
HL1910E-230V-UK
| Lead Time: 9-12Days | -- -- | 3800 | Total:
$
| |
4-103186-0-15
| Te Connectivity |
CONN HEADER VERT 30POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6100 | Total:
$
| |
9-103326-0-15
| Te Connectivity |
CONN HEADER R/A 30POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 900 | Total:
$
| |
9-146256-0-15
| Te Connectivity |
CONN HEADER VERT 30POS 2.54MM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6200 | Total:
$
|