Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ATS-X53150G-C1-R0
Advanced Thermal Solutions Inc
STR FIN 14.25X14.25X12.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
8500
Total: $
ATS-X53210R-C1-R0
Advanced Thermal Solutions Inc
STR FIN 20.25X20.25X19.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
6500
Total: $
MAX22445FAWE+T
Analog Devices
DGTL ISOLTR 5KV 4CH GP 16-SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
7200
Total: $
SI88440EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
1100
Total: $
SI88441EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
4800
Total: $
DF3E-8P-2V(51)
Hirose Electric Co.,Ltd.
CONN HEADER SMD 8POS 2MM

MPQ: 1000

Lead Time: 9-12Days

-- --
8600
Total: $
SI88442EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
600
Total: $
ATS-X53350K-C1-R0
Advanced Thermal Solutions Inc
STR FIN 34.25X34.25X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
4300
Total: $
SI88443EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
8000
Total: $
SI88444EC-ISR
Skyworks
DGTL ISOLTR 5KV 4CH GP 20-SOIC

MPQ: 1250

Lead Time: 9-12Days

-- --
5300
Total: $
800-80-008-30-001101
Preci-Dip
CONN HEADER SMD 8POS 2.54MM

MPQ: 850

Lead Time: 9-12Days

-- --
7200
Total: $
MAX14945EWE+T
Analog Devices
DG ISO 2.75KV 3CH RS422 16-SOIC

MPQ: 1000

Lead Time: 9-12Days

-- --
3400
Total: $
ATS-X51270K-C1-R0
Advanced Thermal Solutions Inc
MAXIFLOW 26.25X26.25X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
3100
Total: $
ATS-X51425D-C1-R0
Advanced Thermal Solutions Inc
MAXIFLOW 41.75X41.75X9.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
8700
Total: $
0022285220
Molex
CONN HEADER VERT 22POS 2.54MM

MPQ: 3000

Lead Time: 9-12Days

-- --
4900
Total: $
ATS-X53330K-C1-R0
Advanced Thermal Solutions Inc
STR FIN 32.25X32.25X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
9600
Total: $
0022285185
Molex
CONN HEADER VERT 18POS 2.54MM

MPQ: 375

Lead Time: 9-12Days

-- --
0
Total: $
ATS-X53190R-C1-R0
Advanced Thermal Solutions Inc
STR FIN 18.25X18.25X19.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
700
Total: $
0022285183
Molex
CONN HEADER VERT 18POS 2.54MM

MPQ: 375

Lead Time: 9-12Days

-- --
1300
Total: $
ATS-X53325K-C1-R0
Advanced Thermal Solutions Inc
STR FIN 31.75X31.75X14.5MM T766

MPQ: 100

Lead Time: 9-12Days

-- --
9700
Total: $
  • 1
  • 3302
  • 3303
  • 3304
  • 3305
  • 3306
  • 6854
Go to