
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
CLTEQ-M81CE-GRP-JAW-RIGHT
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 700 | Total:
$
| |
IR-550-19-RG-6-NOSECONE
| Te Connectivity |
REFLECTOR RG-6 IR-550
| Lead Time: 9-12Days | -- -- | 6000 | Total:
$
| |
IR-1900-TEMP-CONTROLLER
| Te Connectivity |
TEMPERATURE CONTROLLER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8800 | Total:
$
| |
CLTEQ-M16B-103-220V-EL-T
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4800 | Total:
$
| |
CLTEQ-M16B-102-120V-EL-T
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2200 | Total:
$
| |
CLTEQ-M81CE-LOW-HTG-ELE
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
IR-550-237-FLTR-DUAL-COAT
| Te Connectivity |
OPTICAL FILTER IR-550
| Lead Time: 9-12Days | -- -- | 1000 | Total:
$
| |
CLTEQ-M105-TEMP-CNTRL-PGM
| Te Connectivity |
TEMPERATURE CONTROLLER
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3000 | Total:
$
| |
CLTEQ-M81CE-UPR-HTG-ELE
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 2100 | Total:
$
| |
CLTEQ-GRP-JWS-RH-M81
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
CLTEQ-GRP-JWS-LH-M81
| Te Connectivity |
BELT HEATER ACCESSORY
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
IR-2200-1KW-HTR
| Te Connectivity |
IR-2200-1KW-HTR
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
2280624-9
| Te Connectivity |
PARTLOW TEMP CONTROLLER, PROG.
| MPQ: 1 Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
IR-1891-STD-ELE-SET-ASSY
| Te Connectivity |
REPLACEMENT HEAT ELEMENT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1900 | Total:
$
| |
3-2280624-7
| Te Connectivity |
PARTLOW TEMP CONT M17R
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
IR1759/3104-CABLE-ASSY
| Te Connectivity |
IR1759/3104-CABLE-ASSY
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
RBK-ILS-PROC-MOTOR
| Te Connectivity |
MOTOR FOR RBK-ILS PROCESSOR
| MPQ: 1 Lead Time: 9-12Days | -- -- | 6800 | Total:
$
| |
IR-2200-1KW-HTR-KTC
| Te Connectivity |
IR-2200-1KW-HTR-KTC
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
AD-1999-TEMP-MEAS-RFLT
| Te Connectivity |
TEMPERATURE MEAS REFLECTOR
| Lead Time: 9-12Days | -- -- | 8900 | Total:
$
| |
CLTEQ-M105-LW-HTG-ELEMENT
| Te Connectivity |
LOWER HEATING ELEMENT
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4400 | Total:
$
|