
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
539666-2
| Te Connectivity |
MATRIZE SPT/TAB 4,8
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| |
91505-3
| Te Connectivity |
CC II HEAD ASSY TYPE III+
| Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| |
91910-2
| Te Connectivity |
TOOL DIE SET PREMIUM COAXICON
| MPQ: 1 Lead Time: 9-12Days | -- -- | 8000 | Total:
$
| |
90652-2
| Te Connectivity |
TOOL PRO-CRIMPER W/DIE MULTILOCK
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4900 | Total:
$
| |
543424-2
| Te Connectivity |
TOOL DIE SET FOR STEPPED FERRULE
| Lead Time: 9-12Days | -- -- | 8600 | Total:
$
| |
539953-2
| Te Connectivity |
ERGO DIE MCP 4,8K
| Lead Time: 9-12Days | -- -- | 1800 | Total:
$
| |
58528-2
| Te Connectivity |
PROCRIMPER DIE
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5600 | Total:
$
| |
69218
| Te Connectivity |
DIE SOLIS 69099 4AWG
| MPQ: 1 Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
2063013-7
| Te Connectivity |
SDE DIE SET, 11.80 MM HEX
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
48172
| Te Connectivity |
PNEU HEAD 6AWG STRATO-THERM
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
69911
| Te Connectivity |
DIE SOLIS 69082 250-300 MCM
| MPQ: 1 Lead Time: 9-12Days | -- -- | 3200 | Total:
$
| |
58380-2
| Te Connectivity |
DIE WO 69710-1 10F IS9433
| MPQ: 1 Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
68010
| Te Connectivity |
DIE COPALUM SEALED 2-1/0AWG
| MPQ: 1 Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
48752-1
| Te Connectivity |
TOOL DIE AMPLI-BOND 69051 8AWG
| MPQ: 1 Lead Time: 9-12Days | -- -- | 1300 | Total:
$
| |
539682-2
| Te Connectivity |
ERGOCRIMP DIE SET MQS
| Lead Time: 9-12Days | -- -- | 7400 | Total:
$
| |
4-1579001-5
| Te Connectivity |
ERGO DIE MCP 1 2 LL EDS
| Lead Time: 9-12Days | -- -- | 9400 | Total:
$
| |
5-1579001-3
| Te Connectivity |
ERGO DIE MCP 1.5K
| Lead Time: 9-12Days | -- -- | 5000 | Total:
$
| |
58079-3
| Te Connectivity |
ULTRAFAST PLUS DIE SET 22-18 AWG
| MPQ: 1 Lead Time: 9-12Days | -- -- | 0 | Total:
$
| |
5-1579007-2
| Te Connectivity |
TUBE
| Lead Time: 9-12Days | -- -- | 4400 | Total:
$
| |
1276565-2
| Te Connectivity |
EXT TOOL FOR .025 REC (TOYATA)
| Lead Time: 9-12Days | -- -- | 8500 | Total:
$
|