
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
PWCWAQ1608F-220KTT
| Prod |
4.69Ω 22uH ±10% 200mA 0603
| Lead Time: 9-12Days | -- -- | 5500 | Total:
$
| |
PSPMAA0805-4R7M-ANP
| Prod |
16A 4.7uH ±20% 9A
| Lead Time: 9-12Days | -- -- | 9100 | Total:
$
| |
PDPTAT0608-220M
| Prod |
/ 2.1A 60mΩ 22uH ±20%
| Lead Time: 9-12Days | -- -- | 300 | Total:
$
| |
PDUUAT105-502MLN
| Prod |
5mH@1kHz 1kV@AC,3secs 3A
| Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| |
0603B332K101CT
| Walsin Technology Corporation |
3300pF-±10%-100V--X7R-06031608-
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
1N4148W
| Kuu |
1.25V@150mA 100V 150mA SOD-123
| Lead Time: 9-12Days | -- -- | 6900 | Total:
$
| |
1206B103K500CT
| Walsin Technology Corporation |
10000pF-±10%-50V--X7R-12063216-
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
AZ5825-01F
| Kuu |
!
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
BSS138
| Kuu |
MOSFET 225mW 50V 220mA 1N
| Lead Time: 9-12Days | -- -- | 8300 | Total:
$
| |
BL8078CC3BTR33
| Shanghai Belling |
LDO BL8078CC3BTR33 SOT-89-3
| Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| |
CC1206KKX7RBBB153
| Yageo |
CAP CER X7R 1206
| Lead Time: 9-12Days | -- -- | 7500 | Total:
$
| |
GM3232HSA
| Gatemode | Lead Time: 9-12Days | -- -- | 1100 | Total:
$
| ||
NX5P3363UKZ
| Nxp Semiconductors |
--1:1-N--3.3A-16-WLCSP2.2x2.2
| Lead Time: 9-12Days | -- -- | 2500 | Total:
$
| |
WPM2341-3/TR
| Kuu | Lead Time: 9-12Days | -- -- | 7900 | Total:
$
| ||
WNM4002-3/TR
| Kuu |
MOSFET 150mW 30V 100mA 1N
| Lead Time: 9-12Days | -- -- | 8100 | Total:
$
| |
WNM2016
| Kuu | Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| ||
WR02X1002FAL
| Walsin Technology Corporation |
RES 10K OHM 1% 1/20W
| Lead Time: 9-12Days | -- -- | 3900 | Total:
$
| |
WR04X1001FTL
| Walsin Technology Corporation |
RES 1K OHM 1% 1/16W 0402
| Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| |
WR04X4701FTL
| Walsin Technology Corporation |
RES 4.7K OHM 1% 1/16W 0402
| Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| |
XC6216B502MR-G
| Torex Semiconductor Ltd. |
LDO 28V 150mA 5V SOT-25-5
| Lead Time: 9-12Days | -- -- | 1900 | Total:
$
|