
| Part No. | Manufacturer | Description | Lead Time | Unit Price(USD) | In Stock | Quantity | Operation |
|---|---|---|---|---|---|---|---|
XC6209F302MR-G
| Torex Semiconductor Ltd. |
PMIC---1--300mA-SOT-25
| Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| |
XC9221A09AMR-G
| Torex Semiconductor Ltd. |
-----DC-DC--IC-SOT-25
| Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| |
XC61CN2202MR-G
| Torex Semiconductor Ltd. |
--1--SOT-23
| Lead Time: 9-12Days | -- -- | 6300 | Total:
$
| |
XC6209F502PR-G
| Torex Semiconductor Ltd. |
PMIC---1--300mA-SOT-89-5
| Lead Time: 9-12Days | -- -- | 9900 | Total:
$
| |
GR2103
| Gr | Lead Time: 9-12Days | -- -- | 3300 | Total:
$
| ||
LM2596S-ADJ
| Gr | Lead Time: 9-12Days | -- -- | 100 | Total:
$
| ||
SD12CT1G
| Hjke/ | Lead Time: 9-12Days | -- -- | 4500 | Total:
$
| ||
35ZLH330MEFC10X12.5
| Rubycon Corporation |
35V ±20% 330uF ,D10xL12.5mm
| Lead Time: 9-12Days | -- -- | 9700 | Total:
$
| |
595D107X0016D2T
| Vishay |
16V ±20% 100uF 140mΩ 2917
| Lead Time: 9-12Days | -- -- | 9500 | Total:
$
| |
2SK209-Y(TE85L,F)
| Toshiba |
RF-Mosfet-N--JFET-10V-500µA-1kHz-SC-59
| Lead Time: 9-12Days | -- -- | 8700 | Total:
$
| |
74HC595
| Gr | Lead Time: 9-12Days | -- -- | 3500 | Total:
$
| ||
AZ1345-04F
| Kuu | Lead Time: 9-12Days | -- -- | 4300 | Total:
$
| ||
HM8642YA
| Gatemode | Lead Time: 9-12Days | -- -- | 4100 | Total:
$
| ||
HM8942T
| Gatemode | Lead Time: 9-12Days | -- -- | 5900 | Total:
$
| ||
HM8089
| Gatemode |
DC-DC HM8089 SOT-23-5
| Lead Time: 9-12Days | -- -- | 6700 | Total:
$
| |
LM321AW-S5TR
| 3Peak |
1 , SOT-23-5
| Lead Time: 9-12Days | -- -- | 7100 | Total:
$
| |
LM358
| Gr | Lead Time: 9-12Days | -- -- | 7700 | Total:
$
| ||
LM321
| Gr | Lead Time: 9-12Days | -- -- | 5100 | Total:
$
| ||
STPS60150CT
| Stmicroelectronics |
1 970mV@60A 150V 30A TO-220AB
| Lead Time: 9-12Days | -- -- | 9300 | Total:
$
| |
YT8512C
| Motorcomm | Lead Time: 9-12Days | -- -- | 100 | Total:
$
|