Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
ZXNB4200JA16TC
Diodes Incorporated
IC LNB BIAS SWITCH U-QFN3030-16

MPQ: 3000

Lead Time: 9-12Days

-- --
4800
Total: $
27630402RP2
Norcomp
CONN HEADER R/A 4POS 2MM

MPQ: 100

Lead Time: 9-12Days

-- --
300
Total: $
ZXNB4201JA16TC
Diodes Incorporated
IC LNB BIAS SWITCH U-QFN3030-16

MPQ: 3000

Lead Time: 9-12Days

-- --
9300
Total: $
BD9596MWV
Rohm Semiconductor
IC PMIC INTEL ATOM E3800

MPQ: 1000

Lead Time: 9-12Days

-- --
900
Total: $
HTMS-107-02-T-S-RA
Samtec
CONN HDR .050" 10POS

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
HTSW-104-08-T-D-NA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9100
Total: $
LP3913SQX-AC/NOPB
Texas Instruments
IC PWR MGMT W/CHRGR 48WQFN

MPQ: 2500

Lead Time: 9-12Days

-- --
8400
Total: $
NCS37000DBG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 74

Lead Time: 9-12Days

-- --
7900
Total: $
HMTSW-105-09-T-S-430-LL
Samtec
CONN HEADER VERT 5POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5800
Total: $
HTSW-104-20-L-S
Samtec
CONN HEADER VERT 4POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
9500
Total: $
HMTSW-204-08-T-S-340
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
4900
Total: $
HMTSW-204-08-T-S-100
Samtec
CONN HEADER VERT 4POS 5.08MM

MPQ: 1

Lead Time: 9-12Days

-- --
7700
Total: $
NCS37000DBRG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
3000
Total: $
HTSW-104-08-TM-D-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
2600
Total: $
NCS37000MNTWG
Onsemi
IC GFCI CTLR CDM 16QFN

MPQ: 3000

Lead Time: 9-12Days

-- --
8100
Total: $
NCS37005MNTWG
Onsemi
IC GFCI CTLR CDM 16QFN

MPQ: 3000

Lead Time: 9-12Days

-- --
0
Total: $
HTSW-104-08-T-D-RA
Samtec
CONN HEADER R/A 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
NCS37010DBG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 74

Lead Time: 9-12Days

-- --
9500
Total: $
NCS37010DBRG
Onsemi
IC GFCI CTLR CDM TSSOP

MPQ: 2500

Lead Time: 9-12Days

-- --
5300
Total: $
HMTSW-108-08-T-S-300
Samtec
CONN HEADER VERT 8POS 2.54MM

MPQ: 1

Lead Time: 9-12Days

-- --
3500
Total: $
  • 1
  • 2141
  • 2142
  • 2143
  • 2144
  • 2145
  • 6854
Go to