Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TSV914AIYDT
Stmicroelectronics
TSV914A Series 5.5 V 8 MHz Rail to Rail SMT Operational Amplifier - SOIC-14

Lead Time: 9-12Days

-- --
1900
Total: $
P6KE8.2A
Dowo

Lead Time: 9-12Days

-- --
2300
Total: $
B5817WS
Dowo

Lead Time: 9-12Days

-- --
2500
Total: $
1.5KE43CA
Dowo

Lead Time: 9-12Days

-- --
2700
Total: $
SMBJ3V3HE3_B/H
Vishay
ESD/TVS Vishay

Lead Time: 9-12Days

-- --
3300
Total: $
5KP33A
Dowo

Lead Time: 9-12Days

-- --
3700
Total: $
M1820Z
Mysentech
1-Wire,±0.1℃@0℃~50℃,-70℃~+150℃,16bit ADC 0.004℃,10.5ms,5.2μA@3.3V,1Hz,1.8V~5.5V,32bit EEPROM。

Lead Time: 9-12Days

-- --
4300
Total: $
M1601Z
Mysentech
1-Wire,±0.1℃@0℃ to 50℃,-70℃~+150℃,16bit ADC 0.004℃,10.5ms,5.2μA@3.3V,1Hz,1.8V~5.5V,32bit EEPROM。

Lead Time: 9-12Days

-- --
4500
Total: $
F12TH5
Kuu

Lead Time: 9-12Days

-- --
100
Total: $
KNTC1206/10KF3450
Kuu

Lead Time: 9-12Days

-- --
300
Total: $
PESD0402MS05
Kuu
!

Lead Time: 9-12Days

-- --
4900
Total: $
KSD103AX
Kuu
600mV@200mA 40V 350mA SOD-523

Lead Time: 9-12Days

-- --
5300
Total: $
CL21A106KACLRNC
Samsung
MLCC 25V ±10% 10uF X5R 0805

Lead Time: 9-12Days

-- --
6100
Total: $
CL32A476KPJNNNE
Samsung
MLCC 10V ±10% 47uF X5R 1210

Lead Time: 9-12Days

-- --
6700
Total: $
SS510A
Dowo

Lead Time: 9-12Days

-- --
7100
Total: $
KNTC0603/30KJ3950
Kuu

Lead Time: 9-12Days

-- --
7300
Total: $
KNTC0603/10KF3380
Kuu

Lead Time: 9-12Days

-- --
7500
Total: $
CL10C470JB81PNC
Samsung
MLCC 50V ±5% 47pF C0G 0603

Lead Time: 9-12Days

-- --
7700
Total: $
KESD0805/27V
Kuu
!

Lead Time: 9-12Days

-- --
8100
Total: $
SPM2512-R22MA
Cjiang
9.6A 220nH ±20% 8.2A SMD,2x2.5mm

Lead Time: 9-12Days

-- --
8900
Total: $
  • 1
  • 19
  • 20
  • 21
  • 22
  • 23
  • 6733
Go to