Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
TL391BQDBVRQ1
Texas Instruments
2.5mV 2V~36V 25nA SOT-23-5

Lead Time: 9-12Days

-- --
7900
Total: $
TZ-P4-1615RGBTCA1-0.55T
Tuozhan

Lead Time: 9-12Days

-- --
2100
Total: $
TZ-P2-0603BTCS1-0.6T
Tuozhan

Lead Time: 9-12Days

-- --
2300
Total: $
TZ-H1010-RGB/A-BU08UF-TA1305NA/W109
Tuozhan

Lead Time: 9-12Days

-- --
2500
Total: $
TZ-P2-0603GTCS1-0.6T
Tuozhan

Lead Time: 9-12Days

-- --
2700
Total: $
TZ-P2-0402GTIA1-0.45T
Tuozhan

Lead Time: 9-12Days

-- --
2900
Total: $
TZ-LAMP03RG4HD-A
Tuozhan

Lead Time: 9-12Days

-- --
5100
Total: $
TPS922051D1DSGR
Texas Instruments
65V, 2A buck LED driver with analog or PWM dimming options

Lead Time: 9-12Days

-- --
8500
Total: $
M25PX16-VMN6TP
Micron
NOR M25PX16-VMN6TP SO-8

Lead Time: 9-12Days

-- --
500
Total: $
PZ254R-11-02P
Xfcn
1x2P ,P=2.54mm

Lead Time: 9-12Days

-- --
9900
Total: $
LRC099-04DT1G
Lrc
ESD

Lead Time: 9-12Days

-- --
9300
Total: $
RC0201FR-07174RL
Yageo
RES SMD 174 OHM 1% 1/20W 0201

Lead Time: 9-12Days

-- --
8300
Total: $
P6SMBJ43CA_R2_00001
Panjit
ESD/TVS 600W Transient Voltage Suppressors 43V BI

Lead Time: 9-12Days

-- --
2700
Total: $
P6SMB43CA_R2_006A1
Panjit

Lead Time: 9-12Days

-- --
3700
Total: $
P2-1206RTCS2-0.9T-F
Tuozhan

Lead Time: 9-12Days

-- --
3500
Total: $
SMCJ40CAHE3-TP
Micro Commercial Components
ESD/TVS 1500W Transient Voltage Suppressor

Lead Time: 9-12Days

-- --
6500
Total: $
GDZ5.6B_AX_10001
Panjit

Lead Time: 9-12Days

-- --
2100
Total: $
LMR51603YFDBVR
Texas Instruments
4.5V-to-65V 0.3A synchronous buck converter with 25µA quiescent current

Lead Time: 9-12Days

-- --
6500
Total: $
MMBTA06_R1_00301
Panjit

Lead Time: 9-12Days

-- --
3500
Total: $
RM12JTN200
Ta-I Technology
1206 20Ω 1/4W ±5% 200V

Lead Time: 9-12Days

-- --
100
Total: $
  • 1
  • 184
  • 185
  • 186
  • 187
  • 188
  • 6854
Go to