Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MSD75-18
Microchip
BRIDGE RECT 3PHASE 1.8KV 75A

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
B25620B1806K981
Tdk
CAP FILM 80UF 10% 1.98KVDC RAD

MPQ: 16

Lead Time: 9-12Days

-- --
2000
Total: $
B25620B1306K981
Tdk
CAP FILM 30UF 10% 1.98KVDC RAD

MPQ: 24

Lead Time: 9-12Days

-- --
1100
Total: $
R71QW4220AA00J
Kemet(Yageo)
CAP FILM 2.2UF 5% 1KVDC RADIAL

MPQ: 192

Lead Time: 9-12Days

-- --
400
Total: $
CB262E0225JBC
Kyocera Avx Components
CAP FILM 2.2UF 5% 100VDC 4030

MPQ: 900

Lead Time: 9-12Days

-- --
1200
Total: $
SFD66T50K475B-F
Cornell Dubilier
CAP FILM 50UF 10% 660VAC RADIAL

MPQ: 24

Lead Time: 9-12Days

-- --
9800
Total: $
SMW7.3473K250K95TR12
Kemet(Yageo)
CAP FILM 0.047UF 10% 250VDC 2824

MPQ: 2300

Lead Time: 9-12Days

-- --
5600
Total: $
MMC7.3474K63K35TR12
Kemet(Yageo)
CAP FILM 0.47UF 10% 63VDC 2824

MPQ: 2300

Lead Time: 9-12Days

-- --
7600
Total: $
F160ST105K050V
Kemet(Yageo)
CAP FILM 1UF 10% 50VDC 2824

MPQ: 1700

Lead Time: 9-12Days

-- --
200
Total: $
MSDM150-08
Microchip
BRIDGE RECT 3P 800V 150A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
7500
Total: $
MMC5.7104K100J35TR12
Kemet(Yageo)
CAP FILM 0.1UF 10% 100VDC 2220

MPQ: 2100

Lead Time: 9-12Days

-- --
4800
Total: $
MSDM150-12
Microchip
BRIDGE RECT 3P 1.2KV 150A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
3900
Total: $
MSDM150-16
Microchip
BRIDGE RECT 3P 1.6KV 150A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
9600
Total: $
MMC16.5685K50C31TR24
Kemet(Yageo)
CAP FILM 6.8UF 10% 50VDC 6560

MPQ: 500

Lead Time: 9-12Days

-- --
9200
Total: $
MSDM200-08
Microchip
BRIDGE RECT 3P 800V 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
2100
Total: $
MSDM200-12
Microchip
BRIDGE RECT 3P 1.2KV 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
1500
Total: $
MSDM200-18
Microchip
BRIDGE RECT 3P 1.8KV 200A M3-1

MPQ: 1

Lead Time: 9-12Days

-- --
6500
Total: $
MMC16.5156K50C31TR24
Kemet(Yageo)
CAP FILM 15UF 10% 50VDC 6560

MPQ: 500

Lead Time: 9-12Days

-- --
6200
Total: $
MSDM50-08
Microchip
BRIDGE RECT 3PHASE 800V 50A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
5200
Total: $
MSDM50-12
Microchip
BRIDGE RECT 3P 1.2KV 50A M2-1

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
  • 1
  • 1367
  • 1368
  • 1369
  • 1370
  • 1371
  • 6854
Go to