Te Connectivity
Profile:
TE Connectivity Ltd., with its stock traded on the New York Stock Exchange under the ticker symbol TEL, is a global leader in designing and manufacturing a diverse range of products that connect and protect the flow of power and data in everyday devices. The company has been operating under various names, including Tyco Electronics, before adopting its current name in 2011 to better reflect its offerings and solutions.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IR21362S
Infineon
IC GATE DRVR HALF-BRIDGE 28SOIC

MPQ: 25

Lead Time: 9-12Days

-- --
5200
Total: $
IR2136J
Infineon
IC GATE DRVR HALF-BRIDGE 44PLCC

MPQ: 27

Lead Time: 9-12Days

-- --
3400
Total: $
IR2136S
Infineon
IC GATE DRVR HALF-BRIDGE 28SOIC

Lead Time: 9-12Days

-- --
3900
Total: $
MTMM-104-05-FM-S-250
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
2500
Total: $
IR2137J
Infineon
IC GATE DRVR HALF-BRIDGE 68PLCC

MPQ: 19

Lead Time: 9-12Days

-- --
1300
Total: $
MTMM-104-05-F-S-250
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
7100
Total: $
LESD11D3.3CT5G
Lrc
ESD

Lead Time: 9-12Days

-- --
8600
Total: $
IR2137Q
Infineon
IC GATE DRVR HALF-BRIDGE 64MQFP

MPQ: 66

Lead Time: 9-12Days

-- --
4400
Total: $
LBZT52C27T1G
Lrc
27V 25.1V~28.9V 100nA

Lead Time: 9-12Days

-- --
8000
Total: $
LRB520S-40T1G
Lrc
390mV 40V 1uA 200mA

Lead Time: 9-12Days

-- --
2000
Total: $
LBZT52C13T1G
Lrc
13V 12.4V~14.1V 100nA

Lead Time: 9-12Days

-- --
3400
Total: $
S-LMSZ5248BT1G
Lrc
18V

Lead Time: 9-12Days

-- --
4000
Total: $
LMUN5311DW1T1G
Lrc
50V 100mA

Lead Time: 9-12Days

-- --
5400
Total: $
LRB501V-40T1G
Lrc
550mV 40V 3uA 100mA

Lead Time: 9-12Days

-- --
6700
Total: $
MTMM-104-05-F-S-245
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
1400
Total: $
MTMM-104-05-F-S-240
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
2600
Total: $
MTMM-104-05-F-S-235
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
5100
Total: $
MTMM-104-05-F-S-230
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
4400
Total: $
MTMM-104-05-F-S-225
Samtec
CONN HEADER VERT 4POS 2MM

MPQ: 1

Lead Time: 9-12Days

-- --
8500
Total: $
IR2151S
Infineon
IC GATE DRVR HALF-BRIDGE 8SOIC

MPQ: 95

Lead Time: 9-12Days

-- --
100
Total: $
  • 1
  • 1137
  • 1138
  • 1139
  • 1140
  • 1141
  • 6854
Go to