Intel
Profile:
Altera, a INTEL company, founded in 1983, is a leading manufacturer of PLDs, including Field-Programmable Gate Arrays (FPGAs), Complex Programmable Logic Devices (CPLDs), and other related solutions. The company is headquartered in San Jose, California, USA.Altera specializes in designing low-power programmable chips. Its product portfolio includes a wide range of FPGAs, SoC FPGAs (System on Chip Field-Programmable Gate Arrays), CPLDs, and HardCopy ASICs. These products are combined with software tools, intellectual property, embedded processors, and customer support to provide valuable programmable solutions to customers worldwide.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PEF55004AEV1.2
Intel
GEMINAX-D4, 4 CHANNEL ADSL2+ DIG

MPQ: 16

Lead Time: 9-12Days

-- --
5300
Total: $
PSB50505EV1.3-G
Intel
AMAZON-ME ADSL/2/2+ CPE SOLUTIO

MPQ: 21

Lead Time: 9-12Days

-- --
1500
Total: $
PEB33322ELV2.2-G
Intel
VINETIC VOICE OVER IP PROCESSOR

MPQ: 23

Lead Time: 9-12Days

-- --
3400
Total: $
PSB7200ZDW
Intel
XWAY HIGH-END SINGLE-CHIP ADSL2/

MPQ: 24

Lead Time: 9-12Days

-- --
6200
Total: $
PSB7200ZDWR
Intel
XWAY HIGH-END SINGLE-CHIP ADSL2/

MPQ: 24

Lead Time: 9-12Days

-- --
5200
Total: $
PSB50600HLV1.2
Intel
XWAY AMAZON-SE ADSL2/2+ CPE SOLU

MPQ: 25

Lead Time: 9-12Days

-- --
1800
Total: $
PEF66008EV2.1-G
Intel
GEMINAX D8XXS 8 CHANNEL ADSL2+

MPQ: 25

Lead Time: 9-12Days

-- --
7300
Total: $
PEF55218EV2.1
Intel
GEMINAX-A8+ MAX 8 CHANNEL ADSL2+

MPQ: 28

Lead Time: 9-12Days

-- --
500
Total: $
PSB7100ZDW-A2
Intel
XWAY HIGH-END SINGLE-CHIP ADSL2/

MPQ: 31

Lead Time: 9-12Days

-- --
2500
Total: $
DJLXP730LE.A1
Intel
LXP730 - MULTI-RATE DSL FRAMER

MPQ: 31

Lead Time: 9-12Days

-- --
4600
Total: $
PEB33321ELV2.2-G
Intel
VINETIC VOICE OVER IP PROCESSOR

MPQ: 33

Lead Time: 9-12Days

-- --
300
Total: $
PSB6973ELV1.2-G
Intel
TANTOS ETHERNET SWITCH CONTROLLE

MPQ: 37

Lead Time: 9-12Days

-- --
500
Total: $
PEF4365TV2.1
Intel
DUSLIC: TWIN SUBSCRIBER LINE INT

MPQ: 38

Lead Time: 9-12Days

-- --
2800
Total: $
PEF66218EV2.1-G
Intel
GEMINAX-A8+ XXS 8 CHANNEL ADSL2+

MPQ: 40

Lead Time: 9-12Days

-- --
8800
Total: $
PEF4365-0T-SV2.1
Intel
DUSLIC: TWIN SUBSCRIBER LINE INT

MPQ: 63

Lead Time: 9-12Days

-- --
7100
Total: $
PSB6972HLV1.3
Intel
TANTOS ETHERNET SWITCH CONTROLLE

MPQ: 63

Lead Time: 9-12Days

-- --
7500
Total: $
PEF42168VV1.2
Intel
XWAY SLIC121 DUAL CHANNEL SLIC

MPQ: 70

Lead Time: 9-12Days

-- --
5100
Total: $
PSB1350A ZGUR
Intel
WIRELESS LAN 802.11 B/G SOLUTION

MPQ: 71

Lead Time: 9-12Days

-- --
4400
Total: $
PEF42068VV1.2
Intel
XWAY SLIC120 DUAL CHANNEL SLIC

MPQ: 75

Lead Time: 9-12Days

-- --
8400
Total: $
PEF4264TV2.1
Intel
DUSLIC DUAL CHANNEL SUBSCRIBER L

MPQ: 97

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 3
  • 4
  • 5
  • 6
  • 7
  • 305
Go to