Intel
Profile:
Altera, a INTEL company, founded in 1983, is a leading manufacturer of PLDs, including Field-Programmable Gate Arrays (FPGAs), Complex Programmable Logic Devices (CPLDs), and other related solutions. The company is headquartered in San Jose, California, USA.Altera specializes in designing low-power programmable chips. Its product portfolio includes a wide range of FPGAs, SoC FPGAs (System on Chip Field-Programmable Gate Arrays), CPLDs, and HardCopy ASICs. These products are combined with software tools, intellectual property, embedded processors, and customer support to provide valuable programmable solutions to customers worldwide.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SRC-T5000 (NO:CAS09485)
Seneasy

Lead Time: 9-12Days

-- --
9500
Total: $
AX210.NGWGIE.NV
Intel

Lead Time: 9-12Days

-- --
3500
Total: $
FH8066501715928SR2KP
Intel

Lead Time: 9-12Days

-- --
400
Total: $
FH8070304243807_SRKUD
Intel

Lead Time: 9-12Days

-- --
3300
Total: $
CM8070104424010SRH6J
Intel

Lead Time: 9-12Days

-- --
6300
Total: $
EP4CE6F17I8LN
Intel

Lead Time: 9-12Days

-- --
6700
Total: $
1SM16BHU3F53E2VG
Intel

Lead Time: 9-12Days

-- --
9500
Total: $
EP20K100QC240-3N
Intel

Lead Time: 9-12Days

-- --
7500
Total: $
EK-10M08E144ES/P
Intel

Lead Time: 9-12Days

-- --
600
Total: $
HW8076502639501-SR38A-MM#955162
Intel

Lead Time: 9-12Days

-- --
6700
Total: $
HW8076504489901-SRH4E-MM#999TV9
Intel

Lead Time: 9-12Days

-- --
3700
Total: $
10M25DAF256C8G
Intel

Lead Time: 9-12Days

-- --
7500
Total: $
CL8070104399211
Intel

Lead Time: 9-12Days

-- --
9600
Total: $
AV8062700843908 SR076
Intel

Lead Time: 9-12Days

-- --
4000
Total: $
10CX150YU484I6G
Intel

Lead Time: 9-12Days

-- --
1400
Total: $
10CX105YU484I6G
Intel

Lead Time: 9-12Days

-- --
4300
Total: $
10CX085YU484I6G
Intel

Lead Time: 9-12Days

-- --
2900
Total: $
EP2C35F672C6N
Intel

Lead Time: 9-12Days

-- --
5600
Total: $
9260.D2WG.LNV
Intel

Lead Time: 9-12Days

-- --
5900
Total: $
CM8071505110503 SRMFT
Intel

Lead Time: 9-12Days

-- --
3200
Total: $
  • 1
  • 275
  • 276
  • 277
  • 278
  • 279
  • 303
Go to