Intel
Profile:
Altera, a INTEL company, founded in 1983, is a leading manufacturer of PLDs, including Field-Programmable Gate Arrays (FPGAs), Complex Programmable Logic Devices (CPLDs), and other related solutions. The company is headquartered in San Jose, California, USA.Altera specializes in designing low-power programmable chips. Its product portfolio includes a wide range of FPGAs, SoC FPGAs (System on Chip Field-Programmable Gate Arrays), CPLDs, and HardCopy ASICs. These products are combined with software tools, intellectual property, embedded processors, and customer support to provide valuable programmable solutions to customers worldwide.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
AGFD019R25A2I3E
Intel
IC FPGA AGILEX-F 2581FBGA

MPQ: 1

Lead Time: 9-12Days

-- --
2200
Total: $
AGFD019R31C3E3E
Intel
IC FPGA AGILEX-F 3184FBGA

MPQ: 1

Lead Time: 9-12Days

-- --
1800
Total: $
N8397JF
Intel
IC MCU 8BIT 16KB ROM 68PLCC

Lead Time: 9-12Days

-- --
9600
Total: $
SAFC165HLFV1.3
Intel
EMBEDDED UTAH, C166 WITH USART I

Lead Time: 9-12Days

-- --
900
Total: $
AN87C196JRF8
Intel
IC MCU 16BIT 16KB OTP 52PLCC

Lead Time: 9-12Days

-- --
7900
Total: $
QX87C196LA20
Intel
IC MCU 16BIT 24KB OTP 52PLCC

Lead Time: 9-12Days

-- --
4100
Total: $
EG87C51RC24
Intel
IC MCU 8BIT 32KB OTP

Lead Time: 9-12Days

-- --
900
Total: $
EE87C51RC24
Intel

Lead Time: 9-12Days

-- --
9000
Total: $
FAGD1652148BA
Intel
IC LASER DRIVER 2.5GBIT

MPQ: 11

Lead Time: 9-12Days

-- --
6300
Total: $
RU82566MM
Intel
IC TXRX FULL/HALF 1/1 81BGA

MPQ: 36

Lead Time: 9-12Days

-- --
9000
Total: $
PBL38621/SOA
Intel
IC BIPOLAR SLIC W/ ON-CHIP RING

MPQ: 43

Lead Time: 9-12Days

-- --
3600
Total: $
PEF55602VV2.1
Intel
IC 2 CHANNEL GEMINAX-L2 MAX

MPQ: 241

Lead Time: 9-12Days

-- --
4400
Total: $
N89C126FX
Intel
TELECOM CIRCUIT, 1-FUNC, CMOS, P

MPQ: 14

Lead Time: 9-12Days

-- --
7600
Total: $
PEF21512EV1.2
Intel
MULTI CHANNEL NETWORK INTERFACE

MPQ: 1

Lead Time: 9-12Days

-- --
8300
Total: $
PXF4225EV1.3-G
Intel
IWORX ATM INTERWORKING CONTROLLE

MPQ: 1

Lead Time: 9-12Days

-- --
3200
Total: $
TLIXF30003
Intel
OPT TRANSPORT PROCESSOR

MPQ: 1

Lead Time: 9-12Days

-- --
700
Total: $
PXF4222EV1.3-G
Intel
IWORX-P ATM INTERWORKING CONTROL

MPQ: 1

Lead Time: 9-12Days

-- --
2800
Total: $
PEB20256EV2.1
Intel
MUNICH256 MULTI CHANNEL NETWORK

MPQ: 3

Lead Time: 9-12Days

-- --
4600
Total: $
PEF20256EV3.2-G
Intel
MUNICH256 MULTI CHANNEL NETWORK

MPQ: 1

Lead Time: 9-12Days

-- --
900
Total: $
PEF24624EV2.1
Intel
SOCRATES SDFE 4 CHANNEL SYMMETRI

MPQ: 1

Lead Time: 9-12Days

-- --
5000
Total: $
  • 1
  • 167
  • 168
  • 169
  • 170
  • 171
  • 305
Go to