Intel
Profile:
Altera, a INTEL company, founded in 1983, is a leading manufacturer of PLDs, including Field-Programmable Gate Arrays (FPGAs), Complex Programmable Logic Devices (CPLDs), and other related solutions. The company is headquartered in San Jose, California, USA.Altera specializes in designing low-power programmable chips. Its product portfolio includes a wide range of FPGAs, SoC FPGAs (System on Chip Field-Programmable Gate Arrays), CPLDs, and HardCopy ASICs. These products are combined with software tools, intellectual property, embedded processors, and customer support to provide valuable programmable solutions to customers worldwide.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
PLMF3000-256
Intel
PKG PROG ADAPTER FBGA256 MAX3K

Lead Time: 9-12Days

-- --
3000
Total: $
PLMG7256-192
Intel
PROG ADAPTER FOR EPM7256-192

Lead Time: 9-12Days

-- --
6100
Total: $
PLMJ3000-44
Intel
PROG ADAPTER FOR 3000A

Lead Time: 9-12Days

-- --
9800
Total: $
PLMJ7000-44
Intel
PROG ADAPTER 7K 44 PIN J LD

Lead Time: 9-12Days

-- --
300
Total: $
PLMJ7000-68
Intel
PROG ADAPTER MAX7 68 PIN

Lead Time: 9-12Days

-- --
3600
Total: $
PLMJ7000-84
Intel
PROG ADAPTER MAX7 84 PIN J-LD

Lead Time: 9-12Days

-- --
3100
Total: $
PLMQ7000-100
Intel
PROG ADAPTER MAX7 100 PIN QFP

Lead Time: 9-12Days

-- --
7100
Total: $
PLMQ7000-100NC
Intel
MAX7K/7KS 100PIN QFP ADAPTER

Lead Time: 9-12Days

-- --
6900
Total: $
PLMQ7128/160-160NC
Intel
MAX 7128(S)/7160(S) 160 QFP NC

Lead Time: 9-12Days

-- --
2900
Total: $
PLMR7256-208NC
Intel
MAX7256/7256S 208-PIN QFP ADAP

Lead Time: 9-12Days

-- --
400
Total: $
PLMSEPC-8
Intel
PROG ADAPTER FOR EPCS 8P SOIC

Lead Time: 9-12Days

-- --
3900
Total: $
PLMT1064
Intel
FLEX TQFP PROGRAMMING ADAPTER

Lead Time: 9-12Days

-- --
7900
Total: $
PLMT7000-100NC
Intel
MAX7/7S 100-PIN TQFP ADAPTERNC

Lead Time: 9-12Days

-- --
2100
Total: $
PLMT7000-44
Intel
PROG ADAPTER 7K 44 PIN TQFP

Lead Time: 9-12Days

-- --
8100
Total: $
PLMUEPC-88
Intel
88-PIN UFBGA ADAPTER

Lead Time: 9-12Days

-- --
9000
Total: $
PLAD3-12
Intel
ADAPTER FOR PL-MPU

Lead Time: 9-12Days

-- --
800
Total: $
N2105CM
Intel
IC DOWNCONV / DEMOD 68-PLCC

MPQ: 1

Lead Time: 9-12Days

-- --
400
Total: $
EPM3064ATI44-10N
Intel
IC CPLD 64MC 10NS 44TQFP

Lead Time: 9-12Days

-- --
2400
Total: $
EPXA1F484C2ES
Intel
IC EXCALIBUR ARM 484FBGA

Lead Time: 9-12Days

-- --
1400
Total: $
IP-ETH-HTILEKRCR
Intel
KR/CR (AN/LT) OPTION FOR H-TILE

MPQ: 1

Lead Time: 9-12Days

-- --
4700
Total: $
  • 1
  • 108
  • 109
  • 110
  • 111
  • 112
  • 303
Go to