Intel
Profile:
Altera, a INTEL company, founded in 1983, is a leading manufacturer of PLDs, including Field-Programmable Gate Arrays (FPGAs), Complex Programmable Logic Devices (CPLDs), and other related solutions. The company is headquartered in San Jose, California, USA.Altera specializes in designing low-power programmable chips. Its product portfolio includes a wide range of FPGAs, SoC FPGAs (System on Chip Field-Programmable Gate Arrays), CPLDs, and HardCopy ASICs. These products are combined with software tools, intellectual property, embedded processors, and customer support to provide valuable programmable solutions to customers worldwide.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
EM2280P01QI
Intel
DC DC CONVERTER 0.5-1.3V

Lead Time: 9-12Days

-- --
3200
Total: $
EM2130H01QI
Intel
DC DC CONVERTER 1.35-3.6V

Lead Time: 9-12Days

-- --
7300
Total: $
EM2120L01QI
Intel
DC DC CONVERTER 0.7-1.325V

Lead Time: 9-12Days

-- --
1800
Total: $
EN5395QI
Intel
DC DC CONVERTER 0.75-5.05V

MPQ: 250

Lead Time: 9-12Days

-- --
6300
Total: $
EN5365QI
Intel
DC DC CONVERTER 0.75-3.3V

MPQ: 250

Lead Time: 9-12Days

-- --
500
Total: $
EN6382QI
Intel
DC DC CONVERTER 0.6-5.9V

Lead Time: 9-12Days

-- --
5500
Total: $
EP5357LUI
Intel
DC DC CONVERTER 0.6-5.2V 3W

Lead Time: 9-12Days

-- --
1200
Total: $
EP5357HUI
Intel
DC DC CONVERTER 1.8-3.3V 2W

Lead Time: 9-12Days

-- --
6200
Total: $
EV1340QI
Intel
DC DC CONVERTER 0.5-0.9V 5W

Lead Time: 9-12Days

-- --
2300
Total: $
EP5362QI
Intel
DC DC CONVERTER 0.6-5.05V

Lead Time: 9-12Days

-- --
5400
Total: $
EP53A8HQA
Intel
DC DC CONVERTER 1.8-3.3V 3W

Lead Time: 9-12Days

-- --
6100
Total: $
EVB-ES1022SI
Intel
EVAL BOARD FOR ES1022

Lead Time: 9-12Days

-- --
9000
Total: $
EVB-EC7401QI
Intel
EVAL 4PHASE PWM CTRLR 8BIT DAC

Lead Time: 9-12Days

-- --
5300
Total: $
EVB-ET4040QI
Intel
EVAL BOARD FOR ED8106 ET4040

Lead Time: 9-12Days

-- --
2500
Total: $
DK-SI-4S100G2N
Intel
KIT DEV STRATIX IV TRANSCEIVER

Lead Time: 9-12Days

-- --
4700
Total: $
DK-PCIE-2SGX90N
Intel
PCIE KIT W/S II GX EP2SGX90N

Lead Time: 9-12Days

-- --
7700
Total: $
DK-SI-2SGX90N
Intel
SI KIT W/SII GX EP2SGX90N

Lead Time: 9-12Days

-- --
300
Total: $
DC-VIDEO-TVP5146N
Intel
VIDEO DAUGHTER CARD

Lead Time: 9-12Days

-- --
3500
Total: $
EVI-EM2COMIF
Intel
USB COMMUNICATIONS I/F DONGLE FO

MPQ: 1

Lead Time: 9-12Days

-- --
8500
Total: $
EVI-ED8100COMMIF
Intel
DONGLE FOR ED8100 SERIES

MPQ: 1

Lead Time: 9-12Days

-- --
8400
Total: $
  • 1
  • 100
  • 101
  • 102
  • 103
  • 104
  • 303
Go to