Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MAX485ESA
Twgmc

Lead Time: 9-12Days

-- --
4900
Total: $
MMBT3904
Twgmc
BJT 200mW 40V 200mA NPN

Lead Time: 9-12Days

-- --
1100
Total: $
MMBT5551
Twgmc
BJT 300mW 160V 600mA NPN

Lead Time: 9-12Days

-- --
4100
Total: $
MMBT2222A
Twgmc
BJT 300mW 40V 600mA NPN

Lead Time: 9-12Days

-- --
6500
Total: $
APM32F030C8T6
Geehy Semiconductor
MCU/MPU/SOC 39 8KB ARM-M0+ 64KB

Lead Time: 9-12Days

-- --
7700
Total: $
BLM18SG700TN1D
Murata
70Ω@100MHz 20mΩ ±25% 4A

Lead Time: 9-12Days

-- --
8900
Total: $
BCX56-16
Twgmc
SOT-89

Lead Time: 9-12Days

-- --
5700
Total: $
ES1D
Twgmc
/ 950mV@1A 200V 1A

Lead Time: 9-12Days

-- --
2300
Total: $
ELM3052(TA)-V
Everlight
1.2V 70mA

Lead Time: 9-12Days

-- --
2700
Total: $
EL0600(TA)
Everlight
7V 10Mbit/s DC 3.75kV

Lead Time: 9-12Days

-- --
6100
Total: $
EL816S1(C)(TU)-F
Everlight
DC 50mA 1.2V

Lead Time: 9-12Days

-- --
7900
Total: $
EL3H7(B)(TA)-VG
Everlight
---3750Vrms-1--4-SSOP

Lead Time: 9-12Days

-- --
8300
Total: $
ELM3053(TA)
Everlight
OPTOISOLATOR 3.75KV TRIAC

Lead Time: 9-12Days

-- --
9300
Total: $
EL3H7(C)(TA)-VG
Everlight
50mA 3.75kV 1.2V

Lead Time: 9-12Days

-- --
3900
Total: $
H11L1
Everlight
4us;4us 3V~15V DC 5kV

Lead Time: 9-12Days

-- --
5300
Total: $
LM2596S-5.0
Twgmc

Lead Time: 9-12Days

-- --
7100
Total: $
MAX3485ESA
Twgmc

Lead Time: 9-12Days

-- --
3100
Total: $
SMBJ5.0CA
Twgmc

Lead Time: 9-12Days

-- --
1300
Total: $
VHF100505HQ1N6BT
Fh
1.6nH

Lead Time: 9-12Days

-- --
8100
Total: $
S3M
Twgmc
SMB

Lead Time: 9-12Days

-- --
9900
Total: $
  • 1
  • 993
  • 994
  • 995
  • 996
  • 997
  • 6854
Go to