Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
X1E000021087700
Seiko Epson Corp
40Ω 12pF 37.4MHz ±10ppm -40℃~+85℃ SMD3225_4P X1E0000210877

Lead Time: 9-12Days

-- --
7900
Total: $
2RK075M-4
Yageo
4.2*4mm 3KA 75V SMD

Lead Time: 9-12Days

-- --
6500
Total: $
AMS1117-3.3V SOT-223
Msksemi

Lead Time: 9-12Days

-- --
9100
Total: $
AO3416
Bourns Inc.
MOSFET 22mΩ@4.5V,6.5A 20V 6.5A 1N

Lead Time: 9-12Days

-- --
8100
Total: $
GBLC08C-N
Bourns Inc.
TVS/ESD GBLC08C-N

Lead Time: 9-12Days

-- --
700
Total: $
GBLC05C-N
Bourns Inc.
[ESD, 30KA

Lead Time: 9-12Days

-- --
3700
Total: $
471KD14
Yageo
14mm 470V

Lead Time: 9-12Days

-- --
7700
Total: $
SMBJ3.3A
Bourns Inc.

Lead Time: 9-12Days

-- --
1100
Total: $
SMBJ24A
Yageo
TVS SMBJ24A 24V SMBDO-214AA

Lead Time: 9-12Days

-- --
300
Total: $
SMBJ18CA/TR13
Yageo

Lead Time: 9-12Days

-- --
8300
Total: $
SMAJ30CA
Bourns Inc.
TVS/ESD SMAJ30CA

Lead Time: 9-12Days

-- --
4300
Total: $
SMAJ18CA
Bourns Inc.
TVS/ESD SMAJ18CA

Lead Time: 9-12Days

-- --
3100
Total: $
SMAJ15A
Bourns Inc.
TVS/ESD SMAJ15A

Lead Time: 9-12Days

-- --
3500
Total: $
SMAJ24CA
Bourns Inc.
TVS/ESD SMAJ24CA

Lead Time: 9-12Days

-- --
7300
Total: $
SMAJ6.0CA
Yageo
TVS SMAJ6.0CA 6V SMADO-214AC

Lead Time: 9-12Days

-- --
9100
Total: $
SMAJ6.0CA
Bourns Inc.
TVS/ESD SMAJ6.0CA

Lead Time: 9-12Days

-- --
6900
Total: $
SMAJ33CA
Bourns Inc.
ESD/TVS 33V 7.5A 400W SMADO-214AC

Lead Time: 9-12Days

-- --
2900
Total: $
SMBJ15CA
Twgmc

Lead Time: 9-12Days

-- --
1500
Total: $
SMBJ24CA
Twgmc

Lead Time: 9-12Days

-- --
2300
Total: $
SMBJ28A
Bourns Inc.
TVS/ESD SMBJ28A

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 976
  • 977
  • 978
  • 979
  • 980
  • 6854
Go to