Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
1N914W
Cbi
1V@10mA 100V 200mA

Lead Time: 9-12Days

-- --
4500
Total: $
2N5551U
Cbi
BJT 80@10mA,5V 500mW 160V 600mA

Lead Time: 9-12Days

-- --
5500
Total: $
2N7002KDW
Cbi
MOSFET 150mW 60V 300mA 2N

Lead Time: 9-12Days

-- --
5700
Total: $
78L05
Cbi
30V SOT-23

Lead Time: 9-12Days

-- --
2900
Total: $
AO3400A
Msksemi

Lead Time: 9-12Days

-- --
1900
Total: $
ADS1299IPAGR
Texas Instruments
8--AFE-24--42mW-64-TQFP10x10

Lead Time: 9-12Days

-- --
7500
Total: $
BAW56
Cbi
1 1.25V@150mA 85V 215mA

Lead Time: 9-12Days

-- --
1700
Total: $
BAT54S
Cbi
1 1V@100mA 30V 200mA

Lead Time: 9-12Days

-- --
1900
Total: $
BAT48WS
Cbi
900mV@500mA 40V 350mA

Lead Time: 9-12Days

-- --
6100
Total: $
BSD3C051L2
Bourns Inc.
TVS/ESD BSD3C051L2

Lead Time: 9-12Days

-- --
6300
Total: $
BAT54WS
Jscj
1V@100mA 21V 100mA

Lead Time: 9-12Days

-- --
5500
Total: $
BC847PN
Cbi
BJT 200mW 45V 100mA NPN+PNP

Lead Time: 9-12Days

-- --
1500
Total: $
BC847BW
Cbi
BJT 200@2mA,5V 200mW 45V 100mA

Lead Time: 9-12Days

-- --
2700
Total: $
BL9161G-18BADRN
Shanghai Belling

Lead Time: 9-12Days

-- --
8500
Total: $
C8051F350-GQR
Silicon Laboratories Inc.
IC MCU 8BIT 8KB FLASH

Lead Time: 9-12Days

-- --
7900
Total: $
DTC143ZE
Cbi
150mW 50V 100mA 1NPN-

Lead Time: 9-12Days

-- --
500
Total: $
MCR100-8
Cbi

Lead Time: 9-12Days

-- --
3700
Total: $
ME6216A33M3G
Microne
LDO 6V 300mA 3.3V

Lead Time: 9-12Days

-- --
700
Total: $
ME3121AM6G
Microne
DC-DC ME3121AM6G

Lead Time: 9-12Days

-- --
8700
Total: $
ME6211C15M5G-N
Microne
LDO 6V 300mA 1.5V

Lead Time: 9-12Days

-- --
9500
Total: $
  • 1
  • 961
  • 962
  • 963
  • 964
  • 965
  • 6854
Go to