Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MMBD7000
Cbi
1 1.25V@150mA 100V 200mA

Lead Time: 9-12Days

-- --
4300
Total: $
MMBD4148CC
Cbi
1 1V@10mA 100V 200mA

Lead Time: 9-12Days

-- --
6100
Total: $
MMBT3906T
Cbi
BJT 100@10mA,1V 150mW 40V 200mA

Lead Time: 9-12Days

-- --
6300
Total: $
MMBD4148SE
Cbi
1 1V@10mA 100V 200mA

Lead Time: 9-12Days

-- --
9700
Total: $
PC357C
Aote
- PC357C SOP-4

Lead Time: 9-12Days

-- --
5300
Total: $
PC817C
Aote
- PC817C DIP-4

Lead Time: 9-12Days

-- --
8300
Total: $
42-21/BHC-AUW/1T
Everlight
LED BLUE CLEAR

Lead Time: 9-12Days

-- --
6700
Total: $
2N7002
Yangjie
MOSFET 350mW 60V 340mA 1N

Lead Time: 9-12Days

-- --
2900
Total: $
79L12
Cbi
!

Lead Time: 9-12Days

-- --
6500
Total: $
78L05U
Cbi

Lead Time: 9-12Days

-- --
4700
Total: $
AD7689BCPZRL7
Analog Devices
16--8--1-SAR-20-LFCSP-WQ4x4

Lead Time: 9-12Days

-- --
2500
Total: $
BAT54SW
Twgmc
SOT-323

Lead Time: 9-12Days

-- --
4500
Total: $
BAS516
Yangjie
1.25V@150mA 100V 250mA

Lead Time: 9-12Days

-- --
8700
Total: $
B5819W
Yangjie
600mV@1A 40V 40uA@40V 1A

Lead Time: 9-12Days

-- --
2100
Total: $
BSS84
Cbi
MOSFET 225mW 50V 130mA 1P

Lead Time: 9-12Days

-- --
1500
Total: $
BSS138
Yangjie
MOSFET 360mW 50V 340mA 1N

Lead Time: 9-12Days

-- --
7700
Total: $
BR24G64FJ-3GTE2
Rohm Semiconductor
EEPROM--IC-64Kb-8K-x-8-I²C-400kHz-8-SOP-J

Lead Time: 9-12Days

-- --
7100
Total: $
BZT52C5V1S
Cbi
5.1V 4.8V~5.4V 2uA@2V

Lead Time: 9-12Days

-- --
3100
Total: $
ES1J
Yangjie
/ 1.7V@1A 600V 1A

Lead Time: 9-12Days

-- --
9500
Total: $
LM2576T-5.0
Taejin Technology Co.,Ltd.
DC-DC

Lead Time: 9-12Days

-- --
5900
Total: $
  • 1
  • 956
  • 957
  • 958
  • 959
  • 960
  • 6854
Go to