Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SD103AW
Cbi
600mV@200mA 40V 350mA

Lead Time: 9-12Days

-- --
3300
Total: $
SC7A20HTR
Silan

Lead Time: 9-12Days

-- --
8300
Total: $
2SD882PU
Cbi
BJT 30@20mA,2V 1W 30V 3A

Lead Time: 9-12Days

-- --
7300
Total: $
AT3H7B-CUH-S
Aote
- AT3H7B-CuH-S SSOP-4

Lead Time: 9-12Days

-- --
8700
Total: $
AT3H7C-CUH-S
Aote
- AT3H7C-CuH-S SSOP-4

Lead Time: 9-12Days

-- --
9100
Total: $
YJL3400A
Yangjie
MOSFET 1.2W 30V 5.6A 1N

Lead Time: 9-12Days

-- --
9300
Total: $
0901192110
Molex
CONN SOCKET 22-24AWG CRIMP

Lead Time: 9-12Days

-- --
7500
Total: $
1N4004
Twgmc
1.1V@1A 400V 1A

Lead Time: 9-12Days

-- --
700
Total: $
1N4148W
Yangjie
1.25V@100mA 75V 150mA

Lead Time: 9-12Days

-- --
4900
Total: $
19-21SURC/S530-A2/4T
Everlight
LED

Lead Time: 9-12Days

-- --
9900
Total: $
G1M
Yangjie
1.1V@1A 1kV 1A

Lead Time: 9-12Days

-- --
8500
Total: $
KIA7815AF-RTF/P
Kec
LDO 35V 1.4A 15V

Lead Time: 9-12Days

-- --
7900
Total: $
MB6S
Yangjie
1V@400mA 600V 5uA@600V 800mA

Lead Time: 9-12Days

-- --
9100
Total: $
MMBT5551T
Cbi
BJT 200mW 160V 600mA NPN

Lead Time: 9-12Days

-- --
1300
Total: $
MMDT3906DW
Cbi
BJT 200mW 40V 200mA PNP

Lead Time: 9-12Days

-- --
9300
Total: $
MM5Z4V7
Cbi
4.7V 4.4V~5V 2uA@1V

Lead Time: 9-12Days

-- --
500
Total: $
MM5Z5V1
Cbi
5.1V 4.8V~5.4V 2uA@1.5V

Lead Time: 9-12Days

-- --
1900
Total: $
MMBT5551
Cbi
BJT 300mW 160V 600mA NPN

Lead Time: 9-12Days

-- --
5100
Total: $
MMBT3906W
Cbi
BJT 100@10mA,1V 200mW 40V 200mA

Lead Time: 9-12Days

-- --
1100
Total: $
MMBT3904T
Cbi
BJT 200mW 40V 150mA NPN

Lead Time: 9-12Days

-- --
1700
Total: $
  • 1
  • 955
  • 956
  • 957
  • 958
  • 959
  • 6854
Go to