Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
RTL8211FSI-CG
Realtek
RTL8211FSI-CG QFN-48

Lead Time: 9-12Days

-- --
1700
Total: $
RTL8309N-VB-CG
Realtek
RTL8309N-VB-CG QFN-64

Lead Time: 9-12Days

-- --
4100
Total: $
S9013
Cbi
BJT 300mW 25V 500mA NPN

Lead Time: 9-12Days

-- --
4100
Total: $
S8050W
Cbi

Lead Time: 9-12Days

-- --
9500
Total: $
WA06Y000PTL
Walsin Technology Corporation

Lead Time: 9-12Days

-- --
5700
Total: $
GS1M
Yangjie
1.1V@1A 1kV 1A

Lead Time: 9-12Days

-- --
8900
Total: $
MM5Z3V0
Cbi
3V 2.8V~3.2V 50uA@1V

Lead Time: 9-12Days

-- --
3700
Total: $
MMBD4448HSDW
Cbi
2 1.25V@150mA 80V 250mA

Lead Time: 9-12Days

-- --
2100
Total: $
MMBT5401T
Cbi
BJT 200mW 150V 600mA PNP

Lead Time: 9-12Days

-- --
5500
Total: $
MMBT3904W
Cbi
BJT 100@10mA,1V 200mW 40V 200mA

Lead Time: 9-12Days

-- --
5700
Total: $
MMBT4401
Yangjie
BJT 300mW 40V 600mA NPN

Lead Time: 9-12Days

-- --
9700
Total: $
MMDT3946DW
Cbi
BJT 200mW 40V 200mA NPN+PNP

Lead Time: 9-12Days

-- --
3500
Total: $
TP2412-TR
3Peak
Low Cost, Low Noise CMOS RRIO

Lead Time: 9-12Days

-- --
8100
Total: $
BAT54C
Cbi
1 1V@100mA 30V 200mA

Lead Time: 9-12Days

-- --
300
Total: $
BAV99
Cbi
1 1.25V@150mA 75V 215mA

Lead Time: 9-12Days

-- --
3900
Total: $
BAV21W
Yangjie
1.25V@200mA 250V 200mA

Lead Time: 9-12Days

-- --
1500
Total: $
BAV199
Yangjie
1 1.25V@150mA 100V 215mA

Lead Time: 9-12Days

-- --
6100
Total: $
IPD30N06S2L-13
Infineon
MOSFET N-CH 55V 30A

Lead Time: 9-12Days

-- --
5100
Total: $
LM2596HVGR-12
Taejin Technology Co.,Ltd.
DC-DC 3A 4.5V~60V 11.58V~12.48V

Lead Time: 9-12Days

-- --
6900
Total: $
1N5819WS
Cbi
900mV@3A 40V 1A

Lead Time: 9-12Days

-- --
900
Total: $
  • 1
  • 954
  • 955
  • 956
  • 957
  • 958
  • 6854
Go to