Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
SS56B
Yangjie
700mV@5A 60V 5A

Lead Time: 9-12Days

-- --
9900
Total: $
SS210
Yangjie
850mV@2A 100V 2A

Lead Time: 9-12Days

-- --
9100
Total: $
SS34B
Yangjie
500mV@3A 40V 3A

Lead Time: 9-12Days

-- --
9500
Total: $
SS36B
Yangjie
700mV@3A 60V 500uA@60V 3A

Lead Time: 9-12Days

-- --
9300
Total: $
SS36
Yangjie
700mV@3A 60V 3A

Lead Time: 9-12Days

-- --
9700
Total: $
SS10U45
Yangjie
430mV@10A 45V 10A

Lead Time: 9-12Days

-- --
9100
Total: $
TLV61070ADBVR
Texas Instruments
IC: PMIC; DC/DC converter; Uin: 500mV÷5.5V; 2.2÷5.5VDC; 2.5A; Ch:

Lead Time: 9-12Days

-- --
8500
Total: $
ES2J
Yangjie
-

Lead Time: 9-12Days

-- --
1900
Total: $
MMBT5401
Yangjie
BJT 300mW 160V 600mA PNP

Lead Time: 9-12Days

-- --
5900
Total: $
MMBT4403
Yangjie
BJT 300mW 40V 600mA PNP

Lead Time: 9-12Days

-- --
7500
Total: $
TAJD226K035RNJV
Kyocera Avx Components
7.7uA@25℃,5min 35V ±10% 22uF

Lead Time: 9-12Days

-- --
3700
Total: $
BAS316
Yangjie
1.25V@150mA 100V 250mA

Lead Time: 9-12Days

-- --
1700
Total: $
BC806-16R
Nexperia
BJT 500mW 80V 500mA PNP

Lead Time: 9-12Days

-- --
5500
Total: $
B340A
Mdd
550mV@3A 40V 3A

Lead Time: 9-12Days

-- --
8300
Total: $
LQP03TN27NH02D
Murata
2.3Ω 27nH ±3% 140mA

Lead Time: 9-12Days

-- --
8500
Total: $
PC817BS
Aote
- PC817BS SOP-4

Lead Time: 9-12Days

-- --
3100
Total: $
PCF8574AT/3,518
Nxp Semiconductors
I-O--8-I²C-100kHz-16-SO

Lead Time: 9-12Days

-- --
4700
Total: $
GCM188R71C105KA64D
Murata
MLCC 16V ±10% 1uF X7R

Lead Time: 9-12Days

-- --
8100
Total: $
MOC3063SM
Aote
MOC3063SM SOP-6-2.54mm

Lead Time: 9-12Days

-- --
4100
Total: $
TL071HIDBVR
Texas Instruments
FET TL071HIDBVR

Lead Time: 9-12Days

-- --
100
Total: $
  • 1
  • 949
  • 950
  • 951
  • 952
  • 953
  • 6854
Go to