Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MX25L25645GM2I-08G
Mxic
IC: FLASH memory; 256MbFLASH; SPI; 104MHz; 2.7÷3.6V; SOP8;

Lead Time: 9-12Days

-- --
1500
Total: $
2N7002KCQ
Yangjie

Lead Time: 9-12Days

-- --
4900
Total: $
ADR3433ARJZ-R7
Analog Devices
10mA 3.5V~5.5V 3.3V

Lead Time: 9-12Days

-- --
2500
Total: $
ACNT-H61L-500E
Broadcom(Avago)
2.7V~5.5V DC 20kV/us 7.5kV

Lead Time: 9-12Days

-- --
6300
Total: $
BAT54C
Yangjie
1 1V@100mA 30V 200mA

Lead Time: 9-12Days

-- --
6700
Total: $
BZT52C56
Yangjie
56V 500mW 100nA@42V

Lead Time: 9-12Days

-- --
900
Total: $
BZT52C5V6S
Yangjie
5.6V 200mW 1uA@2V 40Ω

Lead Time: 9-12Days

-- --
2300
Total: $
ES2D
Yangjie
/ 950mV@2A 200V 2A

Lead Time: 9-12Days

-- --
9700
Total: $
ES1G
Yangjie
/ 1.3V@1A 400V 1A

Lead Time: 9-12Days

-- --
3700
Total: $
HFBR-1531Z
Broadcom(Avago)
HFBR-1531Z

Lead Time: 9-12Days

-- --
6500
Total: $
GS3M
Yangjie
1.1V@3A 1kV 3A

Lead Time: 9-12Days

-- --
9500
Total: $
HCPL-7800-500E
Broadcom(Avago)
HCPL-7800-500E

Lead Time: 9-12Days

-- --
6100
Total: $
LL4148
Yangjie
1V@50mA 100V 5uA@75V 300mA

Lead Time: 9-12Days

-- --
9100
Total: $
LT3045IDD#TRPBF
Analog Devices
LDO 20V 500mA 0V~15V

Lead Time: 9-12Days

-- --
2700
Total: $
SS310A
Yangjie
850mV@3A 100V 3A

Lead Time: 9-12Days

-- --
8500
Total: $
SS510A
Yangjie
850mV@5A 100V 5A

Lead Time: 9-12Days

-- --
9300
Total: $
US1002FL_R1_00001
Panjit
1V@1A 200V 1A

Lead Time: 9-12Days

-- --
3100
Total: $
YJL2305B
Yangjie
MOSFET 1.2W 20V 5.4A 1P

Lead Time: 9-12Days

-- --
2100
Total: $
YBS3010
Yangjie
1V@1.5A 1kV 5uA@1kV 3A

Lead Time: 9-12Days

-- --
300
Total: $
MMBT3906
Yangjie
BJT 300mW 40V 200mA PNP

Lead Time: 9-12Days

-- --
5500
Total: $
  • 1
  • 947
  • 948
  • 949
  • 950
  • 951
  • 6854
Go to