Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MMBT3904T
Bourns Inc.

Lead Time: 9-12Days

-- --
1300
Total: $
MMBT3906T
Bourns Inc.

Lead Time: 9-12Days

-- --
3900
Total: $
BSD5C121V
Bourns Inc.
TVS BSD5C121V

Lead Time: 9-12Days

-- --
7900
Total: $
BSD3A051V
Bourns Inc.
BSD3A051V

Lead Time: 9-12Days

-- --
5500
Total: $
BM3407
Bourns Inc.

Lead Time: 9-12Days

-- --
6900
Total: $
BDFN2C051RF2
Bourns Inc.
DFN1006/0402 5V Cj=0.2pF TVS

Lead Time: 9-12Days

-- --
8700
Total: $
BAV70W
Jscj
1 1.25V@150mA 75V 150mA

Lead Time: 9-12Days

-- --
3500
Total: $
BZX84C10
Jscj
10V 300mW 200nA@7V

Lead Time: 9-12Days

-- --
2700
Total: $
BZT52C15S
Bourns Inc.
15V 13.8V~15.6V 100nA@10.5V

Lead Time: 9-12Days

-- --
300
Total: $
IRLML6402
Bourns Inc.
MOSFET 50mΩ@4.5V,3.7A 20V 3.7A 1P

Lead Time: 9-12Days

-- --
6700
Total: $
L9012QLT1G
Lrc
BJT 225mW 20V 500mA PNP

Lead Time: 9-12Days

-- --
9300
Total: $
LBZT52C24T1G
Lrc
24V 22.8V~25.6V 100nA

Lead Time: 9-12Days

-- --
9700
Total: $
LBC817-16LT1G
Lrc
BJT 225mW 45V 500mA NPN

Lead Time: 9-12Days

-- --
100
Total: $
LBSS138WT1G
Lrc
MOSFET 150mW 50V 200mA 1N

Lead Time: 9-12Days

-- --
8500
Total: $
LBZT52C6V8T1G
Lrc
6.8V 6.4V~7.2V 2uA

Lead Time: 9-12Days

-- --
3300
Total: $
LBC856BDW1T1G
Lrc
BJT 380mW 65V 100mA PNP

Lead Time: 9-12Days

-- --
6100
Total: $
MMDT3904
Jscj
BJT 200mW 40V 200mA NPN

Lead Time: 9-12Days

-- --
5900
Total: $
SMD1812-300/24N
Bourns Inc.
/Fuse SMD1812-300/24N

Lead Time: 9-12Days

-- --
5700
Total: $
SMBJ70A
Bourns Inc.
VC=113V IPP=5.3A SMB

Lead Time: 9-12Days

-- --
3700
Total: $
SD12C
Bourns Inc.
ESD/TVS VRWM=12V VBRmin=13.3V VC=26V@IPP=10A SOD323

Lead Time: 9-12Days

-- --
2900
Total: $
  • 1
  • 915
  • 916
  • 917
  • 918
  • 919
  • 6854
Go to