Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
MMBT4401
Blue Rocket
SOT23-3 NPN VCEO=60V Ic=600mA

Lead Time: 9-12Days

-- --
2500
Total: $
DS34W
Blue Rocket

Lead Time: 9-12Days

-- --
2900
Total: $
RS2MW
Blue Rocket
/ RS2MW

Lead Time: 9-12Days

-- --
3300
Total: $
MSESD5Z5.0C
Msksemi
5C

Lead Time: 9-12Days

-- --
700
Total: $
BSMD1812-200-24V
Bhfuse
24V 2A

Lead Time: 9-12Days

-- --
7900
Total: $
BZT52C22
Twgmc
22V 20.8V~23.3V 100nA@15.4V

Lead Time: 9-12Days

-- --
2300
Total: $
BSMD0805-010-33V
Bhfuse
0805 0.1A 33V

Lead Time: 9-12Days

-- --
6900
Total: $
BSMD0603L-100
Bhfuse
BSMD0603L-100 0603

Lead Time: 9-12Days

-- --
7300
Total: $
DSS310
Bourns Inc.
850mV@3A 100V 500uA@100V 3A

Lead Time: 9-12Days

-- --
5900
Total: $
DTC114ECA
Msksemi
SOT-23

Lead Time: 9-12Days

-- --
2100
Total: $
DTC114EUA
Twgmc

Lead Time: 9-12Days

-- --
3100
Total: $
LTH7
Tech Public
LTH7

Lead Time: 9-12Days

-- --
9500
Total: $
S1M
Twgmc
1.1V@1A 1kV 1A

Lead Time: 9-12Days

-- --
700
Total: $
SB10100L
Twgmc
TO-277

Lead Time: 9-12Days

-- --
300
Total: $
S1G
Twgmc
1.1V@1A 400V 1A

Lead Time: 9-12Days

-- --
3900
Total: $
SLVU2.8-4
Tech Public
TVS/ESD SLVU2.8-4

Lead Time: 9-12Days

-- --
8500
Total: $
SI2301S
Bourns Inc.
MOSFET 1W 20V 2.3A 1P

Lead Time: 9-12Days

-- --
8300
Total: $
SI2306
Twgmc
MOSFET SI2306 SOT-23

Lead Time: 9-12Days

-- --
8900
Total: $
US1M
Twgmc
/ 1.65V@1A 1kV 1A

Lead Time: 9-12Days

-- --
500
Total: $
ES1J
Twgmc
/ 1.7V@1A 600V 1A

Lead Time: 9-12Days

-- --
3700
Total: $
  • 1
  • 909
  • 910
  • 911
  • 912
  • 913
  • 6854
Go to