Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BSMD0603-100-6V
Bhfuse

Lead Time: 9-12Days

-- --
8500
Total: $
BSMD0603-075-6V
Bhfuse
BSMD0603-075-6V 0603

Lead Time: 9-12Days

-- --
8700
Total: $
BSMD0603-010-15V
Bhfuse
BSMD0603-010-15V 0603

Lead Time: 9-12Days

-- --
8900
Total: $
BSMD2920-100-60V
Bhfuse
BSMD2920-100-60V 2920

Lead Time: 9-12Days

-- --
3900
Total: $
BZT52C6V2
Mdd
6.2V 5.8V~6.6V 1uA@3V

Lead Time: 9-12Days

-- --
6300
Total: $
BZT52C3V0S
Jscj
3V 2.8V~3.2V 10uA@1V

Lead Time: 9-12Days

-- --
6700
Total: $
C945
Jscj
C945 TO-92

Lead Time: 9-12Days

-- --
7900
Total: $
LR8103B-T18
Lr
LDO 6.5V 300mA 1.8V

Lead Time: 9-12Days

-- --
5300
Total: $
LR8323B-T33
Lr
LDO 24V 300mA 3.3V

Lead Time: 9-12Days

-- --
5700
Total: $
LR7550-T
Lr
LDO 24V 100mA 5V

Lead Time: 9-12Days

-- --
4300
Total: $
MHT150UBCT
Meihua

Lead Time: 9-12Days

-- --
2700
Total: $
MHK33153GEYBTD
Meihua

Lead Time: 9-12Days

-- --
4300
Total: $
MHL3014UBTD
Meihua
/LED MHL3014UBTD LED_D3X5.38MM_TM

Lead Time: 9-12Days

-- --
4500
Total: $
MHK1339EGBDT
Meihua
/LED MHK1339EGBDT LED_7X6.35MM_TM

Lead Time: 9-12Days

-- --
5500
Total: $
RS1G
Mdd
/ 1.3V@1A 400V 1A

Lead Time: 9-12Days

-- --
5900
Total: $
S1B
Mdd
1.1V@1A 100V 1A

Lead Time: 9-12Days

-- --
6500
Total: $
S8550
Umw
BJT 300mW 25V 500mA PNP

Lead Time: 9-12Days

-- --
2100
Total: $
SP485ECN-L/TR
Exar(Maxlinear)
IC TRANSCEIVER HALF 1/1

Lead Time: 9-12Days

-- --
500
Total: $
ETA8103S2G
Eta Semiconductor

Lead Time: 9-12Days

-- --
2900
Total: $
ETA5050V28S2F
Eta Semiconductor

Lead Time: 9-12Days

-- --
8700
Total: $
  • 1
  • 901
  • 902
  • 903
  • 904
  • 905
  • 6854
Go to