Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
L7809CV
Umw
LDO 26V 1.2A 9V

Lead Time: 9-12Days

-- --
3300
Total: $
JMTL400N04A
Jiejie Microelectronics

Lead Time: 9-12Days

-- --
8900
Total: $
264-10SURD/S530-A3
Everlight
LED RED DIFFUSED 3.0MM ROUND

Lead Time: 9-12Days

-- --
7100
Total: $
78L15
Umw
PMIC - - 1 100mA SOT-89-3

Lead Time: 9-12Days

-- --
2300
Total: $
BSMD1812-200-16V
Bhfuse
BSMD1812-200-16V 1812

Lead Time: 9-12Days

-- --
1700
Total: $
BSMD1206-300-6V
Bhfuse
BSMD1206-300-6V 1206

Lead Time: 9-12Days

-- --
9100
Total: $
BSMD2920-300-30V
Bhfuse
2920 3A 30V

Lead Time: 9-12Days

-- --
700
Total: $
BSMD1812-150-24V
Bhfuse
BSMD1812-150-24V 1812

Lead Time: 9-12Days

-- --
1100
Total: $
BSMD2920-400-30V
Bhfuse
2920 4A

Lead Time: 9-12Days

-- --
2500
Total: $
BSMD2920-200-33V
Bhfuse
BSMD2920-200-33V 2920

Lead Time: 9-12Days

-- --
1500
Total: $
BSMD1206-020-30V
Bhfuse
BSMD1206-020-30V 1206

Lead Time: 9-12Days

-- --
7900
Total: $
BSMD1206-100-16V
Bhfuse
BSMD1206-100-16V 1206

Lead Time: 9-12Days

-- --
8100
Total: $
BSMD0603-001-60V
Bhfuse
BSMD0603-001-60V 0603

Lead Time: 9-12Days

-- --
8500
Total: $
BSMD0603-002-60V
Bhfuse
BSMD0603-002-60V 0603

Lead Time: 9-12Days

-- --
9300
Total: $
BSMD0805L-200
Bhfuse
BSMD0805L-200 0805

Lead Time: 9-12Days

-- --
9500
Total: $
BSMD1206-050-33V
Bhfuse

Lead Time: 9-12Days

-- --
6900
Total: $
BSMD1206-050-6V
Bhfuse

Lead Time: 9-12Days

-- --
7300
Total: $
BSMD0805-010-24V
Bhfuse
BSMD0805-010-24V 0805

Lead Time: 9-12Days

-- --
7700
Total: $
BSMD0603-010-24V
Bhfuse
BSMD0603-010-24V 0603

Lead Time: 9-12Days

-- --
8100
Total: $
BSMD0603L-150
Bhfuse
6V 1.5A

Lead Time: 9-12Days

-- --
8300
Total: $
  • 1
  • 900
  • 901
  • 902
  • 903
  • 904
  • 6854
Go to