Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
IR908-7C(E6)
Everlight
IR908-7CE6

Lead Time: 9-12Days

-- --
3700
Total: $
LR6206B-U33
Lr
LDO 6.5V 300mA 3.3V

Lead Time: 9-12Days

-- --
3900
Total: $
LR8323B-T50
Lr
LDO 24V 300mA 5V

Lead Time: 9-12Days

-- --
4900
Total: $
PESD5V2S2UT
Umw
PESD5V2S2UT

Lead Time: 9-12Days

-- --
6900
Total: $
BZT52C3V9S
Jscj
3.9V 3.7V~4.1V 3uA@1V

Lead Time: 9-12Days

-- --
500
Total: $
CJAC130SN06L
Jscj
MOSFET 2.6mΩ@10V 60V 130A 1N

Lead Time: 9-12Days

-- --
100
Total: $
GBU610
Mdd
1V@3A 1kV 10uA@1kV 6A

Lead Time: 9-12Days

-- --
2900
Total: $
LESD5Z5.0C-H
Mdd
TVS 5V 8A@8/20us

Lead Time: 9-12Days

-- --
1700
Total: $
NCD0603R5
Nationstar
/LED 0603

Lead Time: 9-12Days

-- --
7500
Total: $
SGM4568YTS20G/TR
Sgmicro

Lead Time: 9-12Days

-- --
4700
Total: $
78L05
Mdd
LDO 30V 100mA 5V

Lead Time: 9-12Days

-- --
3700
Total: $
CJ4153
Jscj
MOSFET 150mW 20V 915mA 1N

Lead Time: 9-12Days

-- --
3100
Total: $
LMBR160T1G
Lrc
700mV 60V 1A

Lead Time: 9-12Days

-- --
2300
Total: $
MHL3016UGTS
Meihua
/LED MHL3016UGTS LED_D3X5.3MM_TM

Lead Time: 9-12Days

-- --
4100
Total: $
MHS190CGCT
Meihua
/LED MHS190CGCT 0603

Lead Time: 9-12Days

-- --
9100
Total: $
MHT150CRCT
Meihua
/LED MHT150CRCT 1206

Lead Time: 9-12Days

-- --
9300
Total: $
MHS110CGCT
Meihua
/LED MHS110CGCT LED_3X1.5MM_SM

Lead Time: 9-12Days

-- --
2100
Total: $
MHLA3029UEGTC
Meihua

Lead Time: 9-12Days

-- --
3300
Total: $
MHK1560CRBTD
Meihua

Lead Time: 9-12Days

-- --
3500
Total: $
MHL3014GTD
Meihua
/LED MHL3014GTD ,D=3mm

Lead Time: 9-12Days

-- --
4700
Total: $
  • 1
  • 899
  • 900
  • 901
  • 902
  • 903
  • 6854
Go to