Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CC0603FRNPO9BN181
Yageo
MLCC 50V ±1% 180pF NP0 0603

Lead Time: 9-12Days

-- --
3900
Total: $
CC1206JKX7R9BB105
Yageo
MLCC 50V ±5% 1uF X7R 1206

Lead Time: 9-12Days

-- --
4300
Total: $
CC0805JRNPO9BN391
Yageo
MLCC 50V ±5% 390pF NP0 0805

Lead Time: 9-12Days

-- --
5500
Total: $
CC1206KKX7RBBB103
Yageo
MLCC 500V ±10% 10nF X7R

Lead Time: 9-12Days

-- --
5700
Total: $
CC0402FRNPO9BN151
Yageo
150pF-±1%-50V--C0G-NP0-04021005-

Lead Time: 9-12Days

-- --
6900
Total: $
CC0402FRNPO9BN181
Yageo
MLCC 50V ±1% 180pF NP0 0402

Lead Time: 9-12Days

-- --
7900
Total: $
CC0805KRX7RABB222
Yageo
MLCC 200V ±10% 2.2nF X7R

Lead Time: 9-12Days

-- --
9300
Total: $
CC0402JRNPO9BN161
Yageo
MLCC 50V ±5% 160pF NP0 0402

Lead Time: 9-12Days

-- --
300
Total: $
RC1206JR-07470RL
Yageo
RES SMD 470 OHM 5% 1/4W 1206

Lead Time: 9-12Days

-- --
500
Total: $
RC1206FR-0782RL
Yageo
RES SMD 82 OHM 1% 1/4W 1206

Lead Time: 9-12Days

-- --
700
Total: $
CC0402JRX7R9BB473
Yageo
MLCC 50V ±5% 47nF X7R 0402

Lead Time: 9-12Days

-- --
1300
Total: $
CC1206JKNPOCBN820
Yageo
MLCC 1kV ±5% 82pF NP0 1206

Lead Time: 9-12Days

-- --
2500
Total: $
CC0603FRNPO0BN470
Yageo
MLCC 100V ±1% 47pF NP0 0603

Lead Time: 9-12Days

-- --
2900
Total: $
RC1210FR-073KL
Yageo
500mW 3kΩ ±1% 1210

Lead Time: 9-12Days

-- --
3300
Total: $
CC0805JRX7R9BB682
Yageo
MLCC 50V ±5% 6.8nF X7R 0805

Lead Time: 9-12Days

-- --
3700
Total: $
CC1206JKNPOCBN271
Yageo
MLCC 1kV ±5% 270pF NP0 1206

Lead Time: 9-12Days

-- --
3900
Total: $
AC0603DR-0710KL
Yageo
RES 10 KOHM 0.50% 1/10W 0603

Lead Time: 9-12Days

-- --
4500
Total: $
RT0603FRE071KL
Yageo
RES SMD 1K OHM 1% 1/10W 0603

Lead Time: 9-12Days

-- --
4900
Total: $
CC1812KKX7RDBB222
Yageo
CAP CER 2200PF 2KV X7R

Lead Time: 9-12Days

-- --
5100
Total: $
CC1206MKX7RDBB102
Yageo
MLCC 2kV ±20% 1nF X7R 1206

Lead Time: 9-12Days

-- --
5300
Total: $
  • 1
  • 88
  • 89
  • 90
  • 91
  • 92
  • 6734
Go to