Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
CJ78L12-TA
Jscj
LDO 35V 100mA 12V

Lead Time: 9-12Days

-- --
8100
Total: $
ME6232A30M3G
Microne

Lead Time: 9-12Days

-- --
7700
Total: $
1206W4F3301T5E
Uni-Royal
1206 3.3KΩ ±1%

Lead Time: 9-12Days

-- --
5700
Total: $
0805W8J050KT5E
Uni-Royal
0805 0.5Ω500mR ±5%

Lead Time: 9-12Days

-- --
4700
Total: $
0402WGF1804TCE
Uni-Royal
62.5mW 1.8MΩ ±1%

Lead Time: 9-12Days

-- --
4900
Total: $
0201WMJ0220TEE
Uni-Royal
0201 22Ω ±5%

Lead Time: 9-12Days

-- --
6100
Total: $
RS1G126XC5
Runic

Lead Time: 9-12Days

-- --
7300
Total: $
CJ7805 TO-252-2L
Jscj

Lead Time: 9-12Days

-- --
8700
Total: $
MM5Z5V6ST1G
Onsemi
5.61V 5.49V~5.73V 1uA@2V

Lead Time: 9-12Days

-- --
1700
Total: $
1N4741APF
Swst
1N4741APF 11V 1W DO-41

Lead Time: 9-12Days

-- --
9500
Total: $
40SS1041A HF
Bothhand

Lead Time: 9-12Days

-- --
1500
Total: $
AC0805FR-7W10KL
Yageo
RES 10 KOHM 1% 1/4W

Lead Time: 9-12Days

-- --
5900
Total: $
BLM03PX121SN1D
Murata
120Ω@100MHz 160mΩ ±25% 700mA

Lead Time: 9-12Days

-- --
2700
Total: $
CC0603KRX7R7BB104
Yageo
MLCC 16V ±10% 100nF X7R

Lead Time: 9-12Days

-- --
2900
Total: $
CC0402JRNPO9BN130
Yageo
MLCC 50V ±5% 13pF NP0

Lead Time: 9-12Days

-- --
9900
Total: $
ERS1HM471G20OT
Aishi
5mm 50V ±20% 470uF

Lead Time: 9-12Days

-- --
900
Total: $
GRM0335C1H150JA01D
Murata
MLCC 50V ±5% 15pF C0G

Lead Time: 9-12Days

-- --
2500
Total: $
GRM0335C1H2R8BA01D
Murata
MLCC 50V 2.8pF C0G

Lead Time: 9-12Days

-- --
3900
Total: $
GS6014 LF
Bothhand

Lead Time: 9-12Days

-- --
1100
Total: $
LBZX84C2V4LT1G
Lrc
2.4V 2.2V~2.6V 225mW

Lead Time: 9-12Days

-- --
6500
Total: $
  • 1
  • 880
  • 881
  • 882
  • 883
  • 884
  • 6854
Go to