Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
GG040205170N2P
Kyocera Avx Components
ESD Suppressor TVS Bi-Dir 5V 2-Pin Case 0402(1006Metric)

Lead Time: 9-12Days

-- --
100
Total: $
NE5532M/TR
Hgsemi
,2023SQ,

Lead Time: 9-12Days

-- --
3300
Total: $
SGM2590DXN5G/TR
Sgmicro

Lead Time: 9-12Days

-- --
1100
Total: $
ULN2003AMT/TR
Hgsemi

Lead Time: 9-12Days

-- --
7700
Total: $
3DD13003
Jscj
3DD13003 TO-126

Lead Time: 9-12Days

-- --
5100
Total: $
74HC165M/TR
Hgsemi
8

Lead Time: 9-12Days

-- --
5500
Total: $
BAT43W
Shikues
450mV@15mA 30V 200mA

Lead Time: 9-12Days

-- --
5100
Total: $
AT24C512CM/TR
Hgsemi
EEPROM 512Kbit

Lead Time: 9-12Days

-- --
8300
Total: $
B772M
Jscj
BJT 1.25W 30V 3A PNP

Lead Time: 9-12Days

-- --
4700
Total: $
CJ78L08
Jscj
LDO 30V 100mA 8V

Lead Time: 9-12Days

-- --
7300
Total: $
CD4052BM/TR
Hgsemi
CMOS

Lead Time: 9-12Days

-- --
3100
Total: $
HMK325C7475KM-PE
Taiyo Yuden
MLCC 100V ±10% 4.7uF X7S

Lead Time: 9-12Days

-- --
4100
Total: $
LM7805CT
Hgsemi
LDO LM7805CT

Lead Time: 9-12Days

-- --
9100
Total: $
LM317C
Jscj
LDO 40V 1.5A 37V

Lead Time: 9-12Days

-- --
3700
Total: $
RC1206FR-07180RL
Yageo
RES SMD 180 OHM 1% 1/4W

Lead Time: 9-12Days

-- --
3500
Total: $
SMAJ20CA
Ruilon
SMAJ20CA

Lead Time: 9-12Days

-- --
2500
Total: $
LM555CN
Hgsemi

Lead Time: 9-12Days

-- --
8700
Total: $
0603WAF100LT5E
Uni-Royal
0603 0.1Ω100mR ±1%

Lead Time: 9-12Days

-- --
500
Total: $
CJU40P04A
Jscj
MOS CJU40P04A

Lead Time: 9-12Days

-- --
1700
Total: $
CJ7809
Jscj
LDO 35V 1.5A 9V

Lead Time: 9-12Days

-- --
4900
Total: $
  • 1
  • 876
  • 877
  • 878
  • 879
  • 880
  • 6854
Go to