Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
DS18B20-MS
Msksemi

Lead Time: 9-12Days

-- --
6700
Total: $
GJM1555C1HR20WB01D
Murata
MLCC 50V 0.2pF C0G

Lead Time: 9-12Days

-- --
4300
Total: $
IRF4905
Umw
MOSFET P-CH 55V 74A

Lead Time: 9-12Days

-- --
2300
Total: $
IR2110STR
Umw

Lead Time: 9-12Days

-- --
8300
Total: $
LM2675M-5.0
Umw
IC 5V 1 1A 8-SOIC0.154",3.90mm

Lead Time: 9-12Days

-- --
3700
Total: $
MHLC3029UEGTD
Meihua
/LED MHLC3029UEGTD LED_D3.85X5.3MM_TM

Lead Time: 9-12Days

-- --
2500
Total: $
OPA333AIDBVR
Umw

Lead Time: 9-12Days

-- --
1300
Total: $
OPA277UA
Umw

Lead Time: 9-12Days

-- --
100
Total: $
ST3232BDR
Umw
2/2 RS232

Lead Time: 9-12Days

-- --
1100
Total: $
TLP621GB-1
Umw
DC 50mA 1.15V

Lead Time: 9-12Days

-- --
9100
Total: $
SN74LVC1G32DBVR
Umw
IC GATE OR 1CH 2-INP

Lead Time: 9-12Days

-- --
6500
Total: $
SN74LVC1G86DBVR
Umw
XOR IC 1

Lead Time: 9-12Days

-- --
3300
Total: $
SML4744A-E3/61
Vishay
15V 1W 5uA@11.4V

Lead Time: 9-12Days

-- --
3700
Total: $
BAS70-04-E3-18
Vishay
-1---70V-200mADC--TO-236-3-SC-59-SOT-23-3

Lead Time: 9-12Days

-- --
6300
Total: $
DMN6075SQ-7
Diodes Incorporated
MOSFET 800mW 60V 2A 1N

Lead Time: 9-12Days

-- --
9900
Total: $
BTC102N
Bourns Inc.
1000V 1kA 2 1812GDT

Lead Time: 9-12Days

-- --
1300
Total: $
DTC143TCA
Jscj
DTC143TCA 03

Lead Time: 9-12Days

-- --
100
Total: $
DTC123ECA
Jscj
DTC123ECA 22

Lead Time: 9-12Days

-- --
300
Total: $
DTC124ECA
Jscj
200mW 50V 30mA 1NPN-

Lead Time: 9-12Days

-- --
7900
Total: $
SCJT1117B-1.2
Jscj
LDO 20V 1A 60dB 1.2V

Lead Time: 9-12Days

-- --
9100
Total: $
  • 1
  • 827
  • 828
  • 829
  • 830
  • 831
  • 6854
Go to