Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C328C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
4200
Total: $
C328C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7200
Total: $
PS8A0032PE
Diodes Incorporated
5LED CERAMIC HEATING CONTROLLER

MPQ: 25

Lead Time: 9-12Days

-- --
9500
Total: $
C326C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
100
Total: $
PT8A3252WE
Diodes Incorporated
5LED CERAMIC HEATING CONTROLLER

MPQ: 50

Lead Time: 9-12Days

-- --
8900
Total: $
PS8A0010PE
Diodes Incorporated
DUAL VOLTAGE HEAT CONTROLLER

MPQ: 50

Lead Time: 9-12Days

-- --
4600
Total: $
C326C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
8600
Total: $
C326C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
6200
Total: $
C326C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
9400
Total: $
PS8A0013PE
Diodes Incorporated
DUAL VOLTAGE HEAT CONTROLLER

MPQ: 50

Lead Time: 9-12Days

-- --
2800
Total: $
PS8A0014PE
Diodes Incorporated
DUAL VOLTAGE HEAT CONTROLLER

MPQ: 50

Lead Time: 9-12Days

-- --
6900
Total: $
C323C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7400
Total: $
C323C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
9900
Total: $
C323C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
6800
Total: $
PT8A3263AWE
Diodes Incorporated
IC HEATING CONTROLLER 16SOIC

MPQ: 50

Lead Time: 9-12Days

-- --
5000
Total: $
C323C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
9500
Total: $
C322C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
4400
Total: $
C322C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
9500
Total: $
PT8A3263BWE
Diodes Incorporated
IC HEATING CONTROLLER 16SOIC

MPQ: 50

Lead Time: 9-12Days

-- --
3400
Total: $
C322C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
5800
Total: $
  • 1
  • 818
  • 819
  • 820
  • 821
  • 822
  • 133045
Go to