Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
C420C273JAR5TA7200
Kemet(Yageo)
CAP CER 0.027UF 250V X7R AXIAL

MPQ: 5000

Lead Time: 9-12Days

-- --
700
Total: $
C327C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
2800
Total: $
C327C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
4800
Total: $
MAX17612BATB+
Analog Devices
IC OVERVOLTAGE/CURRENT 10TDFN

MPQ: 490

Lead Time: 9-12Days

-- --
7500
Total: $
C327C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7700
Total: $
UCS1003-2-BP-TR
Microchip
IC USB PORT POWER CTRLR

MPQ: 5000

Lead Time: 9-12Days

-- --
1400
Total: $
MP201DS-LF
Mps
IC REG LDO 42V 30MA

MPQ: 100

Lead Time: 9-12Days

-- --
6800
Total: $
LP3906SQ-VPFP/NOPB
Texas Instruments
IC REG DC-DC/LINEAR DUAL 24WQFN

MPQ: 1000

Lead Time: 9-12Days

-- --
700
Total: $
LP2997M
Texas Instruments
IC DDR-II TERMINATION REG 8-SOIC

MPQ: 95

Lead Time: 9-12Days

-- --
6600
Total: $
C327C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
5000
Total: $
C325C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
5400
Total: $
C325C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
1900
Total: $
C325C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
2000
Total: $
C325C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7100
Total: $
C324C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
8900
Total: $
C324C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
600
Total: $
C324C224K2R5TA7301
Kemet(Yageo)
CAP CER 0.22UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
1500
Total: $
C324C184K2R5TA7301
Kemet(Yageo)
CAP CER 0.18UF 200V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7800
Total: $
C328C224KAR5TA7301
Kemet(Yageo)
CAP CER 0.22UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
1900
Total: $
C328C184KAR5TA7301
Kemet(Yageo)
CAP CER 0.18UF 250V X7R RADIAL

MPQ: 2500

Lead Time: 9-12Days

-- --
7900
Total: $
  • 1
  • 817
  • 818
  • 819
  • 820
  • 821
  • 133045
Go to