Xilinx(Amd)
Profile:
Xilinx, a AMD company,pronounced as /ˈzaɪlɪŋks/ (zy-lingks), is a leading provider of programmable logic solutions based in the United States. Founded in 1984 in Silicon Valley, California, with its headquarters in San Jose, Xilinx has established branches in various locations, including Colorado, Ireland, Singapore, India, China, and Japan. The company is listed on NASDAQ with the ticker symbol XLNX. Xilinx is renowned for inventing the Field-Programmable Gate Array (FPGA), a technology that has revolutionized the programmable logic industry. From being a single FPGA enterprise, Xilinx has strategically transformed into a global leader in All Programmable FPGA, SoC, MPSoC, and 3D IC solutions. Xilinx integrates industry-leading devices with a new generation of design environments and IPs to meet the diverse needs of customers for programmable logic and even programmable system integration.
Part No. Manufacturer Description Lead Time Unit Price(USD) In Stock Quantity Operation
BAS16HT3G
Onsemi
1.25V@150mA 100V 200mA

Lead Time: 9-12Days

-- --
4900
Total: $
CAT25160VI-GT3
Onsemi
EEPROM -40℃~+85℃ 16Kbit SPI 1.8V~5.5V

Lead Time: 9-12Days

-- --
6500
Total: $
CC0603GRNPO9BN201
Yageo
200pF-±2%-50V--C0G-NP0-06031608-

Lead Time: 9-12Days

-- --
3900
Total: $
FOD814SD
Onsemi
AC,DC 50mA 1.2V

Lead Time: 9-12Days

-- --
3500
Total: $
NTD3528U2
Nationstar

Lead Time: 9-12Days

-- --
5500
Total: $
NTD3528R2
Nationstar

Lead Time: 9-12Days

-- --
8900
Total: $
NTD3528U4
Nationstar

Lead Time: 9-12Days

-- --
9300
Total: $
NPD3535I6
Nationstar

Lead Time: 9-12Days

-- --
900
Total: $
NPD3535UV1
Nationstar

Lead Time: 9-12Days

-- --
1100
Total: $
CJ7808 TO-252-2L
Jscj

Lead Time: 9-12Days

-- --
700
Total: $
MSE1PB-M3/89A
Vishay
Rectifier Diode Switching 100V 1A 780ns 2-Pin Micro SMP

Lead Time: 9-12Days

-- --
6100
Total: $
2R3600T-8
Ruilon
2R3600T-8

Lead Time: 9-12Days

-- --
3100
Total: $
2N7000
Onsemi
MOSFET 400mW 60V 350mA 1N

Lead Time: 9-12Days

-- --
9500
Total: $
ATMEGA2560-16AUR
Microchip
MCU/MPU/SOC 86 8KB AVR 256KB

Lead Time: 9-12Days

-- --
2300
Total: $
Z1SMA82
Diotec Semiconductor
82V 77V~88V 1uA@62V

Lead Time: 9-12Days

-- --
5100
Total: $
FJV1845FMTF
Onsemi
BJT 300mW 120V 50mA NPN

Lead Time: 9-12Days

-- --
1500
Total: $
FM-B1921RGBA-SH
Nationstar

Lead Time: 9-12Days

-- --
2100
Total: $
FQD13N06LTM
Onsemi
MOSFET 2.5W;28W 60V 11A 1N

Lead Time: 9-12Days

-- --
100
Total: $
FQD8P10TM
Onsemi
MOSFET 2.5W;44W 100V 6.6A 1P

Lead Time: 9-12Days

-- --
300
Total: $
MMBZ5228BLT1G
Onsemi
Zener Diode Single 3.9V 5% 23Ohm 300mW 3-Pin SOT-23

Lead Time: 9-12Days

-- --
1700
Total: $
  • 1
  • 813
  • 814
  • 815
  • 816
  • 817
  • 6854
Go to